Similar Projects
Brewster-Douglas Housing Project Redevelopment
New Construction, Demolition - 79,000 SF
Design
$300,000,000 est. value
Detroit, MI 48201

Kitchen/Restaurant Equipment and/or PA/Bell/Clock Technology BP 3 Phase 1
Bidding
Dearborn Heights, MI

Interior Renovations at Niji-Iro Elementary School
Renovation
Post-Bid
Livonia, MI

Districtwide Renovations BP 3 - Gibraltar School District
Renovation
Post-Bid
Woodhaven, MI 48183

Bus Loop and Parking Enhancement
Results
Romulus, MI 48174

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

Amerman Elementary Remodeling
Renovation
Post-Bid
Northville, MI

Goals Expansion
Post-Bid
Plymouth, MI

Maples Elementary And Lowery Middle School Kitchen Remodeling
Post-Bid
Dearborn, MI

Burger Baylor School Site Improvements
Post-Bid
Wayne, MI 48184

Administration Building Remodel and Multiple Building Mechanical Improvements
Renovation
Post-Bid
Grosse Ile, MI

HVAC Equipment, Labor & Supplies
Renovation
Post-Bid
Detroit, MI 48209

General Construction of Ann Visger Elementary School Walk-in Cooler/Freezer
Post-Bid
River Rouge, MI

Ford Career-Technical Center Addition and Remodeling Project
Renovation, Addition
Post-Bid
Westland, MI

Seitz Middle School Pool Addition and Entry Improvements at Huntington Elementary School.
Post-Bid
Riverview, MI 48193

Reported 06/06/2019 12:00 AM
Project Title

Barton Elementary Cafeteria Kitchen Renovation

Physical Address View project details and contacts
City, State (County) Detroit, MI 48204   (Wayne County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1- Install new three (3) compartment Stainless steel commercial grade sink with Swing Faucet, drain air gap connected to existing grease trap. 2- Install 125 amp 208 vac 3-phase Panelboard in kitchen south wall; connect feeders to existing Panel DLP in Main Electrical Room to supply new refrigeration and Winston ovens. 3- Install two (2) 30 amp 208 VAC circuits with 3-phase receptacles for Winston ovens in kitchen 4- Install hand wash stainless steel sink with hot/cold faucet and drain to existing connection. 5- Install two (2) 20 amp 120 VAC receptacles on dedicated circuits for refrigeration equipment where needed in kitchen 6- Install two (2) Lithonia LED Flatpanel luminaires in existing lay-in ceiling; remove and discard old luminaires; connect to existing switch. 7- Remove old pass thru counter top, install new stainless steel custom fabricated counter to fit existing overhead rollup door; opening counter top to be on both sides of rollup door. 8- Install one (1) 20 amp 208 VAC 1-phase 4-wire receptacle and dedicated circuit for new steam table located by counter 9- Convert kitchen bathroom to dry storage room – Install new flooring. This will no longer be a bathroom.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents