Similar Projects
Wastewater Treatment Plant Expansion
Addition
Design
Divide, CO

Wastewater System Improvements - 2021
Renovation
Bidding
$400,000 est. value
Palmer Lake, CO

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

Peetz Wastewater Treatment Facility
Results
$1,500,000 to $2,000,000 est. value
Peetz, CO 80747

Center Sanitation District Wastewater Treatment Plant Improvements
Results
Lakewood, CO

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Harold D. Thompson Wastewater Treatment Facility (HDT) - Aeration Basin 3 - Biological Nutrient Removal (BNR)
Renovation
Construction
Fountain, CO

Rifle Wastewater Reclamation Facility Dewatering Improvements
Post-Bid
Less than $744,000 est. value
Rifle, CO

ERMD New Sewage Treatment Plant
Results
$6,000,000 to $7,000,000 est. value
Durango, CO 81301

Headworks Building
Renovation
Construction
Rangely, CO

Wastewater Treatment Plant Improvements Project
Post-Bid
Grand Junction, CO

Replacement for Water Resource Recovery Facility Laboratory
Results
Boulder, CO 80304

Evaluate Digester Alternatives for the Improvement and Or Replacement of the Plants Two Aerobic Digesters
New Construction
Post-Bid
Delta, CO

Boulder Water Resource Recovery Facility Process Automation System Phase II
Results
Boulder, CO

Reported 05/12/2022 12:00 AM
Project Title

Progressive Design Build Procurement for the Telluride Regional Wastewater Treatment Plant (TRWWTP) Expansion Project

Physical Address View project details and contacts
City, State (County) Telluride, CO   (San Miguel County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Design-Build. Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To expand and upgrade the Telluride Regional Wastewater Treatment Plant (TRWWTP) to meet the increasing needs of the service area and increasingly stringent effluent discharge standards. The Town would like to work with a Design-Builder Team under a Progressive Design Build Agreement to accomplish this goal in two phases: Phase 1 - a preconstruction phase and Phase 2 - a construction phase.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents