Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

Building Additions and Modifications - New Public Works Facilities
Infrastructure
Bidding
$200,000 CJ est. value
Swissvale, PA 15218

Building Additions and Modifications - New Public Works Facilities
Infrastructure
Bidding
$200,000 CJ est. value
Swissvale, PA 15218

Rehabilitation of the Roberto Clemente (6th Street) Bridge
Infrastructure
Post-Bid
$34,400,000 CJ est. value
Pittsburgh, PA 15222

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Small Diameter Water Main Replacement - Contract C
Results
$9,900,000 est. value
Pittsburgh, PA

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Results
$4,905,999 CJ est. value
Reno, NV 89502

Castlegate Green / Mount Lebanon
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Pittsburgh, PA 15226

The Park (Southside Works Riverfront Apartments)
New Construction, Infrastructure - 350,000 SF
Construction
$85,000,000 CJ est. value
Pittsburgh, PA 15203

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Fairywood Industrial Development
New Construction, Infrastructure - 150,000 SF
Pending Verification
$7,000,000 CJ est. value
Pittsburgh, PA 15219

Mars Valencia Rd Culvert
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Pine Township, PA 15090

Last Updated 03/30/2023 09:23 AM
Project Title

Aspinwall Pump Station to Lanpher Reservoir Rising Main

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15222   (Allegheny County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2019
Bids Due View project details and contacts
Estimated Value $4,658,090 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PWSA is seeking qualified design firms that are financially and technically qualified to perform the scope of services as described herein. PWSA is interested in those firms that provide innovative solutions to the challenges of constructing this pipeline through heavily congested neighborhoods. PWSA is looking for firms that have experience in design and construction of large diameter transmission mains, trenchless technologies and can exhibit cost savings and schedule acceleration. All proposals must be submitted in accordance with the solicitation that can be obtained by sending an e-mail to Charlene Juratovic at cjuratovic@pgh2o.com. There will be no charge for the solicitation, as it will be sent via e-mail. All questions relating to the solicitation itself shall be directed to Nicole Dickun, Procurement Manager, via e-mail to: ndickun@pgh2o.com, no later than August 28, 2018 at 4:00 p.m. No bonds are required. The Contractor must assure that employees and applicants for employment are not discriminated against because of their race, color, religion, sexual preference, sex, or national origin. The Authority reserves the right to withhold the award of the Contract for a period of 90 days after the opening of the proposals. The Authority reserves the right to reject any or all proposals, and to waive any informality or minor irregularity in any proposal or proposals. The Authority also retains the right to investigate the qualifications of bidders prior to any award and to award contracts only to contractors who, in the sole judgment of the Pittsburgh Water and Sewer Authority, are qualified and equipped to properly execute the specified work. As of August 7, 2018 this project is seeking requests for proposals. The method of contractor selection has not been determined at this time. Although a firm construction timeline was not disclosed, construction is not expected to begin prior to the spring of 2019. *Project information, including timeline and contacts, has been obtained through public sources. Architect and/or general contractor involvement has not been confirmed. The Editorial Content Team is working toward contact confirmations. Inquiries should be directed to the contact(s) listed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents