Similar Projects
Mechanical, Electrical and Plumbing (MEP) Engineering Services
Term Contract
Conception
Liberty, MO 64068

RFP - Risk Management Consulting Services
Term Contract
Conception
Liberty, MO 64068

KC Tech Academy School Building / Liberty
New Construction, Infrastructure - 17,480 SF
Design
$9,000,000 CJ est. value
Liberty, MO 64068

Holiday Inn Express - Summit Street / Kansas City
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Kansas City, MO 64118

Resurface in the Watkins Mill State Park
Infrastructure
Bidding
$1,000,000 CJ est. value
Kansas City, MO 64167

RFQ Engineering - Engineering Design and Construction Services for Replacement - Stockdale Road Bridge Over Canadian Pacific Railroad
Infrastructure
Bidding
$900,000 CJ est. value
Fishing River Township, MO 64068

Eye Center of Gladstone
New Construction, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Gladstone, MO 64118

Smithville School District - Summer 2023 Campus Improvements Package
Infrastructure, Renovation
Sub-Bidding
$5,000,000 CJ est. value
Smithville, MO 64089

North Kansas City Schools 2022
New Construction
Post-Bid
North Kansas City, MO

New High School
New Construction
Post-Bid
Kansas City, MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Results
Gladstone, MO

Gladstone Downtown District Parking, Lighting and Street Rehabilitation
Infrastructure
Results
Gladstone, MO

Ford Motor Company Stamping Plant / Liberty
Addition, Demolition, Infrastructure - 55,000 SF
Construction
$6,424,320 CJ est. value
Liberty, MO 64068

Commerce Bank - Liberty Bell Circle / Liberty
New Construction, Infrastructure - 7,000 SF
Construction
$2,000,000 CJ est. value
Liberty, MO 64068

Liberty Self-Storage
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Liberty, MO 64068

Last Updated 03/29/2023 11:18 AM
Project Title

Construction of Javelin Runways

Physical Address View project details and contacts
City, State (County) Liberty, MO 64068   (Clay County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $73,438 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Javelin Runways. Question Deadline 10/10/2022 at 3:00 PM CT All questions, requests for information or clarification pertaining to this bid must be submitted in writing to Jason Breit at jason.breit@lps53.org The District reserves the right to accept or reject all or any part of any quote/proposal/bid, to waive technicalities, and to accept the offer that the District considers to be the most advantageous. A Payment Bond will be required from any vendor that submits a total bid proposal in excess of $50,000. The undersigned Bidder agrees to furnish a Payment Bond in the amount of 100% of the total contract value prior to execution of the formal service contract, agreement or issuance of an official district purchase order. Locations of work: Liberty High School Liberty North High School 200 Blue Jay Drive Liberty, MO 64068 Liberty North High School 1000 NE 104 th Street Liberty, MO 64068 All work associated with Notes 2 and 7 under Sheet 1 of 1 on Liberty High School and Liberty North High School Documents. Work will be coordinated with concrete contractor to ensure compatibility and timing of synthetic surface installation . All work must be completed by March 1, 2023. Bid Results: Liberty High School Bid Package 1: Larry Brown Excavating - $3,750 Bid Package 2: McConnell and Associates- $16,735 Bid Package 3 : McConnell and Associates - $16,384 Liberty North High School Bid Package 1: Larry Brown Excavating - $3,450 Bid Package 2: McConnell and Associates- $16,735 Bid Package 3 : McConnell and Associates - $16,384

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents