Similar Projects
Influent Submersible Pump
Infrastructure
Bidding
Cary, NC

Rebuilding of Pumps for Fuel Farm
Post-Bid
Elizabeth City, NC 27909

Burton Park Castle Hayne Monitoring Wells
Post-Bid
Jacksonville, NC 28541

NRRRF RAS Screw Pump Replacement
Results
Less than $4,300,000 est. value
Raleigh, NC 27610

Bladen County Water District - Phase IV, Contract 2 - Production Well Project
Results
NC

Replacement Parts for Pumps
Post-Bid
Jacksonville, NC 28540

C and D RAS Pump Rehabilitation
Results
Less than $6,000,000 est. value
Rocky Mount, NC 27801

Ostwalt Amity Area Water System Expansion Contract II - Well Buildings
Post-Bid
NC

Test and Production Wells 3 and 4
Results
Less than $235,000 est. value
Lake Waccamaw, NC 28450

Lower Rocky River Pump Station Screening and Influent Gate Replacement
Post-Bid
Harrisburg, NC 28075

River Pump Motor, Removal and Installation
Results
Halifax, NC 27887

Turbo Molecular Vacuum Pump
Post-Bid
Raleigh, NC 27695

Hampstead/Scott's Hill Well Project
Results
Hampstead, NC

Well 11 Motor Replacement
Post-Bid
Kinston, NC

Well Supply System Disinfectant Modifications and Distribution System Improvements
Results
$400,000 est. value
Hot Springs, NC 28743

Last Updated 10/04/2021 10:27 AM
Project Title

Contract III - 2020 USDA Well Building Improvements

Physical Address View project details and contacts
City, State (County) Red Springs, NC 28377   (Robeson County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of the rehabilitation of the three public water supply wells and well buildings utilized by the Town of Red Springs. The scope of work will vary between the three well sites, as detailed in the plans, and includes multiple alternate method options. Rehabilitation work will include replacement and/or addition of site fencing and gating, cleaning and redevelopment of the wells, replacement of valves and other equipment associated with the well heads, and refurbishment and/or replacement of well building structures, roofs, electrical panels, paint, and other non-structural components. Work shall also include the installation of a magnetic flow meter in place of the existing flow meter at each well site (three total).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents