Similar Projects
Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Burke Lane Subdivision
New Construction, Infrastructure
Design
$69,000,000 CJ est. value
Farmington, UT 84025

Well Pump Station
Infrastructure
Design
$900,000 CJ est. value
Farmington, UT 84025

Hill Air Force Base Composite Aircraft Antenna Calibration Facility (CAACF)
New Construction, Infrastructure - 32,000 SF
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Hill Air Force Base Composite Aircraft Antenna Calibration Facility (CAACF)
New Construction, Infrastructure - 32,000 SF
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Clearfield Station Tod Infrastructure Project
Infrastructure
Post-Bid
Clearfield, UT 84015

Damage Repair SR 67 Mp 8.04 Legacy Parkway
Infrastructure
Post-Bid
Centerville, UT 84014

Bonneville Shoreline Design and Construction
Results
UT

District Asphalt Work
Results
Layton, UT

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Alta Townhomes & Commercial Development
New Construction, Infrastructure - 9,481 SF
Pending Verification
$17,000,000 CJ est. value
Clearfield, UT 84015

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

Cynthia Way And Dorthea Way - City of North Salt Lake
Infrastructure
Conception
$416,250 CJ est. value
North Salt Lake, UT 84054

Last Updated 02/05/2023 10:35 PM
Project Title

Washington Park

Physical Address View project details and contacts
City, State (County) Bountiful, UT 84010   (Davis County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected July 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $660,000 [brand] Estimate
Plans Available from Landscape Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new park at the site of a former elementary school. Proposed amenities include: field spaces, restroom building, pavilions, pickelball courts, court lighting and fencing, new parking lots. Installation of new irrigation systems, modification of existing irrigation system, landscaping installation. Demolition of existing park facilities. New site lighting equipment. 1. Late Contract Time Completion: Two Hundred Dollars ($200.00) for each day or part thereof that expires after the Contract Time until the Work is accepted as Substantially Complete as provided in Article 56 of the General Conditions. . Late Punch List Time Completion: 50% of the amount specified for Late Contract Time Completion for each day or part thereof if the Work remains incomplete after the Punch List Time. The Punch List shall be considered delivered on the date it is transmitted by facsimile, email, hand delivery or received by the CONTRACTOR by certified mail. Anticipated date of Start of Construction: July 21, 2022. Substantial Completion shall occur no later than 120 days from notice to proceed Question Submission Close Date 6/6/2022 12:00 PM MDT

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents