Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Blair Gap Run Bridge
Demolition, New Construction, Infrastructure
Conception
$3,942,800 CJ est. value
East Freedom, PA 16637

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

I-99 Newry Pulloff to Plank Rd Intchg
Infrastructure
Design
$11,150,000 CJ est. value
Juniata Township, PA 16635

US 22 - Weller Road to End of 4-Lane
Infrastructure
Bidding
$5,000,000 CJ est. value
Frankstown Township, PA 16648

US 22 - Weller Road to End of 4-Lane
Infrastructure
Bidding
$5,000,000 CJ est. value
Frankstown Township, PA 16648

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

SR 865 Waterline Replacement Project
Infrastructure
Post-Bid
Bellwood, PA

Watts Road Culvert Replacement Project
Infrastructure
Results
$341,430 CJ est. value
Antis Township, PA 16686

Recoating of HSC Sedimentation Basins
Infrastructure
Results
$289,616 CJ est. value
Altoona, PA 16601

O'Reilly Auto Parts (AT1) #6625 / Altoona
New Construction, Infrastructure - 7,135 SF
Construction
$1,300,000 CJ est. value
Altoona, PA 16601

Self Storage - Patton Township
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Altoona, PA 16601

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

PA 764 - 17th St to Pleasant Valley
Infrastructure
Design
$2,399,483 CJ est. value
Altoona, PA 16602

CIP Waterline Replacement
Infrastructure
Post-Bid
Hollidaysburg, PA

Last Updated 05/06/2023 11:02 AM
Project Title

13th Street and 23rd to 28th Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Altoona, PA 16601   (Blair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $554,914 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

13th Street and 23rd to 28th Avenue Drainage Improvements The Project consists of construction of stormwater conveyance improvements from 23rd-28th Avenue between 11th-13th Street in the City of Altoona, Blair County, Pennsylvania. Contract: City of Altoona - 23rd-28th Avenue Drainage Improvements Work performed on this project to be as per current Pennsylvania Department of Transportation Publication 408, as amended and revised. Either an original Certified Check, Official Check, Cashier's Check, or Bid Bond drawn to the order of the "City of Altoona" equal to ten (10%) percent of the amount of the bid must be submitted with the proposal. Note that the Bid Bond must be in effect for a period of sixty (60) days from the bid opening date. Mayor and City Council reserve the right to reject any or all bids and waive any informality not material to the bid and to award the contract as may be deemed to the best interest of the City of Altoona. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Work performed on this project will be subject to prevailing wage rates as established by the Pennsylvania Department of Labor and Industry. CLARIFICATION DEADLINE 4/18/2023 12:00 PM Completion- (120) consecutive calendar days

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents