Similar Projects
South Belt Line Industrial and Distribution Development
New Construction
Conception
$7,000,000 est. value
Irving, TX 75060

DFW Walnut Hill
New Construction
Design
Irving, TX 75038

Balch Springs Industrial
New Construction - 140,940 SF
Design
$10,632,107 est. value
Balch Springs, TX 75180

Lancaster Industrial Building 1
New Construction
Post-Bid
Lancaster, TX 75146

Sparky Bts
New Construction - 513,038 SF
Post-Bid
$10,000,000 CJ est. value
Wilmer, TX 75134

Perot Industrial Park Phase I
New Construction
Construction
$10,000,000 CJ est. value
Irving, TX 75038

West Singleton Distribution Center
New Construction - 636,000 SF
Construction
$10,000,000 CJ est. value
Dallas, TX

N2 Publishing / Irving
Build-out - 32,836 SF
Pending Verification
$6,500,000 CJ est. value
Irving, TX 75063

Shady Grove Logistics Crossing
New Construction, Infrastructure - 1,073,318 SF
Pending Verification
$170,000,000 CJ est. value
Grand Prairie, TX 75050

Roe Street Industrial / Roe Building - Elevators
New Construction - 745 SF
Design
$1,500,000 est. value
Dallas, TX 75215

Belt Line Industrial Building
New Construction - 1,109,543 SF
Post-Bid
$10,000,000 CJ est. value
Wilmer, TX 75172

Texport Logistics Industrial Building
New Construction - 826,620 SF
Construction
$25,000,000 est. value
Wilmer, TX 75172

NewSouth Window Solutions
Renovation - 16,234 SF
Pending Verification
$500,000 CJ est. value
Richardson, TX 75080

G-Industrial Grand Prairie
New Construction - 70,050 SF
Design
$6,000,000 est. value
Grand Prairie, TX 75050

Hunter Ferrell Industrial
New Construction - 210,476 SF
Post-Bid
$10,000,000 CJ est. value
Grand Prairie, TX 75050

Last Updated 09/13/2022 11:09 AM
Project Title

Jay Shinn Studio

Physical Address View project details and contacts
City, State (County) Dallas, TX 75207   (Dallas County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Communication Building, Industrial Warehouse
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $235,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New restrooms and break room, storage area, and warehouse area. As of September 13, 2022, this project is in the permitting phase. An architect and a general contractor have been selected. A timeline for construction has yet to be announced. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

4,100 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents