Similar Projects
Water Station Electrical Improvements - ATS Replacement - Station 20 and 21
Alteration
Conception
$490,000 est. value
Schaumburg, IL

Installation, Repair and Replacement of Various Electrical, Lighting, Traffic Control, Security, Audio-Video and Public Address Systems Infrastructure
Alteration
Bidding
$5,000,000 est. value
Chicago, IL 60666

Guaranteed Energy Savings Performance
Alteration
Bidding
$700,000 est. value
Lyons, IL

Lighting Replacement at Rolling Meadows Library
Post-Bid
Rolling Meadows, IL 60008

Building T Heating Water Plant Upgrades
Post-Bid
Palos Hills, IL 60465

Berwyn Police Department Fire Pump Controller Replacement
Results
Berwyn, IL 60402

54-Inch Intake Heater Cable Replacement
Results
Evanston, IL

On-Call Electrical Repair Services
Alteration
Bidding
Chicago, IL

Police Department UPS Replacement
Post-Bid
Northbrook, IL 60062

Utility Pole Replacement
Results
IL 60120

Generator Installation
Term Contract
Post-Bid
IL

LED Lighting
Results
$90,509 est. value
Palatine, IL

Classroom Air Conditioning and Electrical Renovations
Renovation
Post-Bid
IL

Healy ES MEP & Holden ES Roof
Results
Chicago, IL 60608

CoGen Elimination and Generator Installation at Bartlett High School
Post-Bid
Elgin, IL

Last Updated 06/21/2022 10:50 PM
Project Title

Fire Station Generator Replacement

Physical Address View project details and contacts
City, State (County) Morton Grove, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work included shall consist of furnishing all the materials, labor, equipment and incidentals required for removing and disposing of the existing 180 KW diesel generator and replacing it with a new 200 KW natural gas generator, replacing the existing standard pressure gas meter with a high pressure meter, installing a new gas regulator to service the facility, trenching and running gas pipe from the meter installation to the generator, backfilling the trench with FA-2 (sand) and CA-6 (Stone) and making all required electrical connections for the generator to service the facility equal to the existing generator being removed.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents