Similar Projects
Milling and Resurfacing of Parking Lot
Infrastructure
Bidding
Dickson, TN 37055

SR 10 Pedestrian Improvements Engineering Services RFQ
Infrastructure
Bidding
Lebanon, TN 37087

Broad Street Sidewalk Repair
Post-Bid
Chattanooga, TN 37402

Construction of a New Parking Lot
Post-Bid
Cleveland, TN 37320

CDBG Sidewalk Install/Repair
Results
Less than $907,898 est. value
Chattanooga, TN

Concrete Pathway Installation, Landscaping, Storm Water Structure Modifications, Irrigation System, L.E.D. Pedestrian Lighting, Installation of ADA Compliant Crossing Ramps, Railroad Safety Improvements
Results
Chattanooga, TN

Parking and Transportation Improvements
Infrastructure
Bidding
Cookeville, TN 38501

Clark Street Streetscaping
Post-Bid
Dyersburg, TN 38024

Sidewalk Repair/Concrete Work
Results
Algood, TN

Hale Property Parking Area
Infrastructure
Bidding
Morristown, TN 37814

Community Center ADA Upgrades
Renovation
Post-Bid
Gatlinburg, TN 37738

RTP Green Record Park Natural Trail
New Construction
Results
Henderson, TN 38340

Construction of Pedestrian Facilities on u.s. 43 (S.R. 6) from Remke Lane (L.M. 23.16) to North of Good Hope Road (L.M. 24.20)
Infrastructure
Bidding
TN

Parking Space Expansion and Entrance Drive Repairs
Post-Bid
Sevierville, TN 37862

Old Broadway Sidewalk Improvements
Renovation
Results
Knoxville, TN 37902

Reported 03/09/2022 05:01 PM
Project Title

Allison Heights and Seven Pines Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Collierville, TN   (Dyer County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Allison Heights Sidewalk Improvements: The work of this contract phase is comprised of demolition, the construction of sidewalks, ADA compliant curb ramps, grading driveway replacement, sire restoration, traffic control, and other items of work shown on the plans for a completed project located in the Allison Heights Neighborhood. Seven Pines Sidewalk Improvements: The work of this contract phase is comprised of demolition, the construction of sidewalks, ADA compliant curb ramps, grading driveway replacement, site restoration, traffic control, and other items of work as shown on the plans for a completed project located in the Seven Pines Neighborhood.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents