Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Hawkins Recreation Center Gymnasium HVAC Replacement
Results
Birmingham, AL 35206

Z--Project 619-17-102 Replace AHU Building 1
Results
$500,000 to $1,000,000 est. value
Montgomery, AL 36109

Chiller Replacement CBSE Building
Post-Bid
$300,000 to $640,000 est. value
Birmingham, AL 35233

Reroofing and HVAC Replacement for Midfield High School
Results
Birmingham, AL

SDB 3rd FL Replace Three Air Handlers
Post-Bid
$300,000 to $350,000 est. value
Birmingham, AL 35233

UAB Spain Wallace AHU - 10 and AHU - 11 Replacement
Results
Birmingham, AL

Service Contract Mobile Museum of Art - Cooling Tower Water Treatment Service
Post-Bid
Mobile, AL 36608

HVAC Controls for Shelby County Schools
Results
Columbiana, AL

Rehabilitation of Cooling Tower
Post-Bid
Huntsville, AL

SWAT Garage - HVAC Replacement
Results
Mobile, AL 36608

Development and Services Building HVAC Upgrades
Post-Bid
Mobile, AL

Hail Storm Remediation for Two of the Facilities at the Cullman County Correctional Complex - HVAC
Results
Cullman, AL 35055

Humidity Control - UAB Alys Stephens Dressing Room Area
Post-Bid
$125,000 to $150,000 est. value
Birmingham, AL

Reported 12/19/2018 12:00 AM
Project Title

Wicksburg High School Lunchroom A/C Replacement

Physical Address View project details and contacts
City, State (County) Newton, AL   (Dale County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replacement Air Conditioner unit for Wicksburg High School Lunchroom unit. Remove existing ground-level package unit Enlarge existing concrete slab with poured concrete to foundationally support and level new unit Install new 10 ton Trane Commercial Series 208/230v 3ph Package unit with standard gas heat equal BTU or Larger to existing furnace (LP gas). In order to keep all HVAC equipment at location standardized for maintenance purposes, Trane Commercial Series Equipment will only be accepted. Unit must have protective condenser coil guards. Make all electrical changes and connections for new equipment to meet all local and state codes. Replace existing service disconnect. Replace wiring from building service to accommodate new equipment if necessary. Replace thermostat and safety controls as required. Install any or all duct work required to adapt new equipment to existing duct system. Make weather proof seals on duct work at building entrance and at equipmen Install secondary weather shield on all exposed duct work
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents