Similar Projects
Last Updated | 02/09/2023 12:40 PM |
Project Title | Daily Rate Bid for Asphalt Repairs |
Physical Address | View project details and contacts |
City, State (County) | Tuttle, OK 73089 (Grady County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractors for a Daily Rate Fee Structure for Various Asphalt Repair Projects. The City Would Like to Enter Into an Agreement With a Qualified Contractor to Provide Asphalt Repair Services Using a Daily Rate Fee Structure. The Daily Rate Fee Would Include the Following: 1. All Equipment Necessary to Complete the Designated Repairs. 2. All Labor Necessary to Complete the Designated Repairs. 3. All Required Safety and Warning Signage Necessary for the Designated Repairs. 4. All Traffic Control Measures Necessary for the Designated Repairs. The City of Tuttle Would Coordinate With the Contractor Enough Repairs for a Minimum of 8 Hours of Work Per Project. The Scope of the Work May Include, but Not Limited to: Overlays, Street Patching, Asphalt Sealing and Crack Sealing. Contact Aaron Slattery, Public Works Director, at 405-381-5902, Ext. 626 or via Email at Aslattery@cityoftuttle.com With Questions or for More Information The City of Tuttle Reserves the Right to Accept or Reject Any and All Proposals, to Waive Formalities, Technicalities or Irregularities and to Re-advertise if Deemed to Be in the Best Interest of the City. Bid Bond and Maintenance Bond - Not Required. Daily Rate Fee: Description of Work: Provide All Equipment, Labor, Safety / Warning Signage and Traffic Control for Designated Asphalt Projects. Scope of Work May Include but Not Limited to: Overlays, Street Patching, Asphalt Sealing, Paint Striping and Crack Sealing. The City of Tuttle Would Provide a Minimum of 8 Hours of Work Per Project and Projects Could Be Bundled to Create Multiple Days of Work. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |