Similar Projects
PAPI Replacement Project
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Hartford, KY 42347

Oakwood Replace/Upgrade and Enhance Generators
Alteration
Post-Bid
$1,899,000 est. value
Somerset, KY 42501

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Post-Bid
Lexington, KY

Lakeview Pump Station Transformer Yard Electrical Upgrades
Renovation
Results
Fort Wright, KY 41017

Cooling Tower Replacement DVA
Alteration
Results
$410,000 est. value
Hanson, KY 42413

Industrial Natural Gas Fired 9.0L V-8 Engine Driven Generator
Renovation
Construction
$56,220 CJ est. value
Marion, KY 42064

Carr Hall Electrical for Boilers - Phase 1
Alteration
Post-Bid
$800,000 est. value
Murray, KY 42071

Virginia Audio, Video, And Theatrical Lighting
Alteration
Results
Somerset, KY 42501

Carr Hall Electrical for Boilers - Phase II
Alteration
Post-Bid
$800,000 est. value
Murray, KY 42071

DAF Panel - PLC Replacement & Start-Up
Alteration
Results
Mc Kee, KY

Lighting Maintenance District 5
Alteration
Post-Bid
Louisville, KY

Telford Hall Replacement - Electrical Feeders
Alteration
Results
Richmond, KY 40475

Optical Cross-Connect Cabinet
Alteration
Post-Bid
Bowling Green, KY

Fields Hall Chiller Installation
Infrastructure
Results
Morehead, KY 40351

Substation Capacitors
Alteration
Post-Bid
Owensboro, KY

Last Updated 10/09/2023 07:14 AM
Project Title

Mayfield Electric and Water Systems 500 - Water Lab Building

Physical Address View project details and contacts
City, State (County) Mayfield, KY 42066   (Graves County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $340,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of panel system work is indicated on the drawings and in these specifications. 2. Panel system requirements include the following components: a. Aluminum faced composite panels with mounting system. Panel mounting system including anchorages, shims, furring, fasteners, gaskets and sealants, related flashing adapters, and masking (as required) for a complete installation.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents