Similar Projects
Repairs and Maintenance of Private Road Crossing Railroad Tracks
Renovation
Post-Bid
Amsterdam, NY 12010

Safe Routes to School Project
Post-Bid
Interlaken, NY 14847

Design Build Services for I 390/I 490/31 (Lyell Ave) Interchange Improvements Phases 3 and 4
Term Contract
Results
Less than $85,000,000 est. value
NY

Rehabilitation of Folts Road - Cr 137
Results
Less than $1,000,000 est. value
Herkimer, NY 13350

Scofield Street Paving
Post-Bid
Walden, NY 12586

Rehabilitation of a Portion of Steuben Hill Road & Steuben Road - Cr 62
Results
Less than $500,000 est. value
Herkimer, NY 13350

Pedestrian Crossing Improvements – New Street
Post-Bid
Saratoga Springs, NY 12866

Rehabilitation of Inghams Mills Road CR 127
Term Contract
Results
Less than $650,000 est. value
Herkimer, NY

Main Street Green Infrastructure Improvement
Post-Bid
North Tonawanda, NY 14120

Croton-on-Hudson Parking Facility, Vehicular, Pedestrian and Bicycle Enhancements
Results
Croton-on-Hudson, NY 10520

North Road (CR 122) and Balsley Road Rehabilitation
Post-Bid
$1,000,000 to $3,000,000 est. value
Seneca Falls, NY 13165

Rehabilitation of a Portion of Travis Road CR 160
Term Contract
Results
Herkimer, NY

Pavement & Curb Replacement
Post-Bid
$2,300,000 to $2,900,000 est. value
Rochester, NY

Chelsea Service Line Connections and Road Repaving
Results
Wappingers Falls, NY

Various Highway Pavement Reclamation Processes
Term Contract
Post-Bid
Ballston Spa, NY 12020

Last Updated 03/02/2021 04:36 PM
Project Title

Wickham Boulevard and Greig Street REDI Project

Physical Address View project details and contacts
City, State (County) Sodus Point, NY 14555   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of storm sewer along Greig Street from the intersection of Bay Street Extension to the end of Greig Street, Bay Street Ext., and from the intersection of Bay Street Ext. and Wickham Blvd. to the end of Wickham Blvd. at Sodus Point Beach Park. This storm sewer will include four pump stations with both gravity and force main outfalls with outfall discharges structures to Sodus Bay. The above referenced roads will have minor grade adjustments and all curb will be replaced and new sidewalk will be placed where shown in the plans. Lastly the project will include approximately 1030 feet of reinforced concrete floodwall along Wickham Blvd. and toward the Village Ball Park.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents