Similar Projects
Harold Washington SSA Elevator Upgrades
Bidding
$5,000,000 to $10,000,000 est. value
Chicago, IL 60661

Elevator Maintenance
Bidding
Arlington Heights, IL

Escalator, Passenger Elevator, Freight Elevator, Dumbwaiter and Wheelchair Lifts 3rd Party Inspection
Post-Bid
Chicago, IL

JRTC Elevator Maintenance and Repair #J0205
Term Contract
Post-Bid
Chicago, IL

UIC - Building 975 Elevator Upgrades (School Of Public Health)
Results
Chicago, IL 60612

Elevator Modernization – Adams County Courthouse
Renovation
Results
Quincy, IL 62301

Elevators, ADA Lifts, Chair Lifts, and Portable Pool Lifts: Maintenance and Repair
Bidding
Chicago, IL

Elevator Preventive Maintenance & Services
Term Contract
Post-Bid
IL

Accessibility & Elevator Upgrades - Bid Package No. 1 (Electrical)
Renovation
Results
Urbana, IL 61801

Argonne Bldg 362 Elevator Modifications
Bidding
Lemont, IL 60439

Elevator Equipment Preventative/Maintenance Services
Term Contract
Post-Bid
Addison, Lombard, Westmont, Wheaton, IL

IL Dept. of Agriculture Elevator Repair, Maintenance and Testing
Results
Springfield, IL 62702

Upgrade Elevators
Bidding
Less than $1,500,000 est. value
IL 60431

Elevator Inspection Services
Term Contract
Post-Bid
Chicago, IL 60606

4D2H Repair Elevator USP Marion
Results
$25,000 to $100,000 est. value
Marion, IL 62959

Last Updated 11/12/2020 06:12 PM
Project Title

Accessibility And Elevator Upgrades - Bid Package No. 1 (General )

Physical Address View project details and contacts
City, State (County) Urbana, IL 61801   (Champaign County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrades to the building's north and south elevators to meet current codes and design standards. One elevator shall remain functioning at all times requiring a phased construction to occur during 2021 summer break and 2022 summer break. The work is similar for both north and south elevators and includes MEP upgrades to elevator machine room, pit ladder, lighting, sump pump, rail slipper guides changed to roller guides, cab and cab doors and operating components, cab controls, call buttons, car position indicators and miscellaneous items including fire protection and suppression and all non-compliant code related items. Elevator 2 shall receive ADA push pad controls. The elevator cylinders for each elevator were replaced as part of a previous project and will not be included in the scope of work of this project. Schedule Phase 1 - Elevator 2 a. Phs1 Onsite Access Starts: May 31, 2021 b. Phs1 Substantial Completion: August 25, 2021 Phase 2 - Elevator 1 a. Phs2 Onsite Access Starts: May 30, 2022 b. Phs2 Substantial Completion: August 25, 2022

Details

Division 02 - Existing Conditions, Demolition, Asbestos Remediation, Asbestos Abatement, Lead Remediation, Lead-Based Paint Remediation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 07 - Thermal and Moisture Protection, Firestopping, Joint Sealants.
Division 09 - Finishes, Common Work Results for Finishes, Veneer Plastering, Gypsum Veneer Plastering, Resilient Flooring, Painting, Interior Painting.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators, Hydraulic Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Commissioning of Plumbing, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Sump Pumps.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Commissioning of HVAC, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Actuators and Operators, Control Valves, Hydronic Piping and Pumps, Hydronic Piping, HVAC Water Treatment, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Convection Heating and Cooling Units, Fan Coil Units.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm, Digital, Addressable Fire-Alarm Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents