Similar Projects
City Hall Campus Parking Lot Replacement
Infrastructure
Design
Farmington Hills, MI 48336

0.59 MI of Concrete Sidewalk Widening, Ramps, Traffic Signal, Signing and Pavement Marking along Farmington Road from Grand River Avenue to Orchard Street
Infrastructure
Bidding
Farmington, MI

Kiwanis Tot Lot CDBG Sidewalk Replacement
Infrastructure
Bidding
Berkley, MI

Rest Area ADA Improvement Eastern Lower Peninsula
Post-Bid

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

City Hall Campus Parking Lot Replacement Project
Results
Less than $298,362 est. value
Farmington Hills, MI

Wildlife Woods Pickleball Courts and Meadowbrook Commons Ramp
Results
Novi, MI 48375

Beverly Park Pathway Improvements
Infrastructure
Bidding
Beverly Hills, MI 48025

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

1.20 MI of Hot Mix Asphalt Shared Use Path, Concrete Sidewalk and Ramps, Pedestrian Signals and Retaining Walls
Results
MI

2.83 Mi of Hot Mix Asphalt Base Crushing, Shaping and Widening, Concrete Curb, Gutter, Sidewalk and Ramps and Pavement Markings and Bridge Rehabilitation Including Deck Overlay and Steel Structure Cleaning and Coating, Guardrail, and Approach Work on Berg Road from 8 Mile Road (m-102) to Simmons Road
Renovation, Infrastructure
Bidding
MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

Huron Valley Trail Resurfacing Project
Results
Less than $404,270 est. value
New Hudson, MI 48165

Crack Sealing and Striping at City Owned Parking Lots
Infrastructure
Bidding
Rochester Hills, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

Last Updated 03/22/2022 02:32 AM
Project Title

Huron Valley Trail Maintenance Project

Physical Address View project details and contacts
City, State (County) Milford, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HMA overlay of existing HMA pathway as well as installation of a RRFB along Old Plank Road.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents