Similar Projects
High Expansion Foam Install with Pumphouse
New Construction
Design
$1,000,000 to $5,000,000 est. value
Middle River, MD

MCC Replacement – Green Branch Wastewater and Mill Branch Wastewater Pump Station
Bidding
Laurel, MD

Heritage Harbor 2 Sewage Pumping Station
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Martingham Distribution Pump Replacement
Renovation
Post-Bid
Saint Michaels, MD 21663

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Stony Run Wastewater Pumping Station Upgrade
Results
$2,500,000 to $5,000,000 est. value
Baltimore, MD

Cedar Lane Water Pumping Station
Results
$2,500,000 to $5,000,000 est. value
MD

Heritage Harbor 2 Sewage Pumping Station Upgrades
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Colgate Stormwater Pumping Station Upgrade
Results
$2,000,000 to $3,000,000 est. value
Baltimore, MD

Construction of Newark Spray Irrigation Facilities
Results
Snow Hill, MD 21863

Smouses Mill Pumping Station Upgrades
Results
$125,000 est. value
Cumberland, MD 21502

Refurbishment of Little Anacostia Wastewater Pumping Station
Renovation
Results
$5,000,000 to $7,000,000 est. value
Capitol Heights, MD 20781

Daniels Area Wastewater Pump Station
Results
Less than $1,505,000 est. value
Columbia, MD 21046

Hyde Park Pumping Station Improvements—Consent Decree
Results
$2,500,001 to $5,000,000 est. value
Hydes, MD 21221

Cockeysville Pumping Station Improvements
Renovation
Results
$5,000,001 to $10,000,000 est. value
Cockeysville, MD 21030

Last Updated 12/17/2020 08:58 AM
Project Title

Locust Grove Sewage Pumping Station Replacement

Physical Address View project details and contacts
City, State (County) La Vale, Locust Grove, MD 21502 (Allegany, Kent Counties)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,000,000 to $12,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Examination and Preparation, Protection of Adjacent Construction, Execution, Bracing and Anchoring.
Division 02 - Existing Conditions, Schedules for Existing Conditions, Schedules for Subsurface Investigations, Boring or Test Pit Log Schedule, Demolition, Thermal Decontamination, Incineration Decontamination, Remediation of Contaminated Soils and Sludges by Incineration, Water Remediation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Construction Joints, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Concrete Curing, Precast Structural Concrete, Grouting.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Anchorage and Reinforcing, Masonry Anchors, Unit Masonry, Glass Unit Masonry, Cast Stone Masonry.
Division 05 - Metals, Common Work Results for Metals, Post-Installed Concrete Anchors, Structural Steel Framing, Steel Decking, Steel Roof Decking, Metal Fabrications, Metal Stairs, Metal Gratings, Plank Gratings.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Sheathing.
Division 07 - Thermal and Moisture Protection, Sheet Waterproofing, Elastomeric Sheet Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Insulation, Exterior Insulation and Finish Systems, Air Barriers, Fluid-Applied Membrane Air Barriers, Coated Foamed Roofing, Sprayed Polyurethane Foam Roofing, Sheet Metal Roofing, Firestopping, Joint Sealants.
Division 08 - Openings, Composite Doors, Fiberglass Doors, Access Doors and Panels, Access Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Hardware, Glazing, Glass Glazing.
Division 09 - Finishes, Acoustical Ceilings, Painting.
Division 10 - Specialties, Signage, Plaques, Dimensional Letter Signage, Telephone Specialties, Partitions, Wire Mesh Partitions, Wall and Door Protection, Bumper Guards, Protective Corridor Handrails, Toilet, Bath, and Laundry Accessories, Bath Accessories, Fire Protection Specialties, Fire Extinguishers.
Division 11 - Equipment.
Division 14 - Conveying Equipment, Elevator Equipment and Controls, Elevator Equipment, Elevator Hoistway Equipment.
Division 22 - Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Vibration and Seismic Controls for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping, Facility Sanitary Sewerage, Packaged, Submersible Sewerage Pump Units, Facility Storm Drainage, Sump Pumps, Submersible Sump Pumps.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Identification for HVAC Piping and Equipment, Anti-Microbial Coatings for HVAC Ducts and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel-Storage Tanks, Facility Underground Fuel-Oil, Storage Tanks, Double-Wall Steel, Underground Fuel-Oil, Storage Tanks, Air Duct Accessories, HVAC Fans, HVAC Power Ventilators, Air Outlets and Inlets, Fuel-Fired Heaters, Packaged Compressor and Condenser Units, Indoor Central-Station Air-Handling Units.
Division 25 - Integrated Automation, Integrated Automation Instrumentation and Terminal Devices.
Division 26 - Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers, Enclosed Switches, Packaged Generator Assemblies, Surge Protective Devices, Lighting.
Division 27 - Communications, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Gas Detection and Alarm, Electronic Detention Monitoring and Control Systems.
Division 31 - Earthwork, Site Clearing, Excavation and Fill, Fill, Compaction, Trenching and Backfilling.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving.
Division 34 - Transportation, Railway Signaling and Control Equipment, Vital Interlocking Logic Controllers.
Division 40 - Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Common Work Results for Process Valves, Bulk Materials Valves, Knife and Slide Gate Bulk Materials Valves, Process Piping and Equipment Insulation, Process Piping Insulation, Process Control Auxiliary Devices.
Division 46 - Water and Wastewater Equipment, Grit Removal and Handling Equipment, Grinding and Shredding Equipment, Open-channel Grinders.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents