Similar Projects
Saw Mill Pump Station Upgrades Project
Renovation
Bidding
Mount Kisco, NY

Canandaigua Lake County Sewer District Pump Station 1W Improvements
Renovation
Bidding
Canandaigua, NY 14424

Williams Road Pump Station Rehabilitation
Post-Bid
Niagara Falls, NY 14304

Pump Station & Drain Line Replace
Post-Bid
Less than $25,000 est. value
Ithaca, NY 14853

GC Phase 2 Water Supply, Contract 3: New Water Pump Stations
Term Contract
Results
Batavia, NY 14020

Hagan Town Pump Station Abandonment and Replacement
Results
$543,288 est. value
Poughkeepsie, NY 12603

Bay Park Conveyance
Term Contract
Construction
Less than $439,000,000 est. value
NY

I-481 and S.R. Industrial Sewer Corridor Project
New Construction
Construction
DeWitt, NY 13057

Town of Rotterdam Sewer District #7 - Extension #2 - Carman Road
Infrastructure
Bidding
Rotterdam, NY

Installation of Piping and a Booster Pump Station
Post-Bid
Clifton Park, NY 12065

Sleepy Hollow Water District Improvements and Extension No 1
Results
Chittenango, NY 13037

Construction of Landfill Cell 6 - Phase XIII
New Construction, Infrastructure
Bidding
Yaphank, NY 11980

Tarbell Hill Road Booster Station Upgrade
Post-Bid
Long Lake, NY 12847

Pump Station Upgrade
Results
Less than $627,800 est. value
Hudson, NY 12534

Reconstruction of 108th Street Pumping Station
Post-Bid
$31,705,000 to $42,895,000 est. value
NY

Last Updated 12/13/2021 04:41 PM
Project Title

Coronet Pump Station Rehabilitation 2021

Physical Address View project details and contacts
City, State (County) Schenectady, NY 12309   (Albany County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replacing guide rails, chains, check valves, gate valves and gate valve supports. The Division of Pure Waters will provide, setup, and maintain a trailer mounted bypass pumping system with approximately 50 to 70 linear feet of discharge hose to bypass the pump station from the upstream sewer manhole 3099 to the bypass standpipe system. Division of Pure Waters will operate and configure bypass standpipe valves for bypass operation. Division of Pure Waters will be responsible for maintaining the bypass pumping system for the duration of the construction project. Bypass pumping system will utilize a float control system and mission alarm system. Bypass pumping system will be installed on Monday of the scheduled work week and will be removed no later than noon on that Friday. Contractor will be expected to complete the work within this scope between Tuesday through Thursday of the scheduled work week. Contractor will be responsible for scheduling the work week with Division of Pure Waters and notifying the Division of Pure Waters when the work is complete and ready for inspection.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents