Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Nancy Ryles Elementary School HVAC Upgrades
Alteration
Bidding
$400,000 est. value
Beaverton, OR 97007

McNary Dam Powerhouse HVAC Controller Repair
Alteration
Bidding
$500,000 est. value
Umatilla, OR 97882

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Public Safety Training Center Makeup-Air Units (MAU) and Exhaust Replacement
Alteration
Bidding
$650,000 est. value
Clackamas, OR 97015

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

HVAC Equipment Replacement
Alteration
Bidding
$25,000 to $50,000 est. value
Kimberly, OR 97848

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

ODF HVAC Direct Digital Control System Upgrade Project: Salem Campus and Tillamook Forest Center
Alteration
Bidding
$500,000 est. value
Salem, OR

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Last Updated 06/14/2022 04:07 PM
Project Title

J041--Mitsubishi & York Chiller Repairs

Physical Address View project details and contacts
City, State (County) White City, OR 97503   (Jackson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide White City, Oregon, VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) services and repairs for chiller units listed below. Work to be completed within 30 days after receipt of award: B201 Pharmacy/CT Scan room York Chiller Recover the 410 A refrigerant Replace circuit #1 Electronic expansion valve that has broken and is stuck in the closed state. Install new EXV And filter driers and purge with nitrogen Pressure test and evacuate the system Re install the recovered 410 A and test run chiller B201 Blood Lab York Chiller Recover refrigerant from circuit #1 Replace the leaking condenser coil Replace the liquid line filter dryer Pressurize, leak check, and evacuate system. Recharge system with recovered refrigerant and top off charge as needed. Cycle chiller and perform complete operational checkout. B249 Mitsubishi Chiller Perform Leak Check Refill Refrigerant R410a Fill Nitrogen Recovery, Evacuation, and Brazing Once complete there will be tests done to ensure the chiller will run throughout the summer without fail. Testing for safety devices and interlocks will also be done. All repairs, and testing will be done in accordance with State, Federal, and VA standards. After completion there will be a report that can be easily understood that will be given to the VA.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents