Similar Projects
FPL Avenir Substation
New Construction - 540 SF
Design
Less than $500,000 CJ est. value
West Palm Beach, FL 33412

Split Oak Substation Construction Project
Post-Bid
Orlando, FL 32832

Storm Restoration Services - Utility Power Infrastructure
Renovation
Post-Bid
Keystone Heights, FL 32656

Design-Build Contract for Sampson Substation Autotransformer No. 2 Replacement 2019
Results
Jacksonville Beach, FL 32227

Berth 1 Shore Power Replacement
Results
Riviera Beach, FL 33404

FPL Westlake Substation
New Construction
Construction
Westlake, FL 33470

T-Mobile Jacksonville Mso Switch Cooling
Construction
$3,066,225 est. value
Jacksonville, FL 32256

Emergency Power Restoration
Renovation
Post-Bid
Live Oak, FL 32060

Substation and Generating Station Maintenance Services
Results
Orlando, FL 32800

Electric Pole Top Repairs Via Helicopter
Post-Bid
Tavernier, FL

Design-Build New White Substation
New Construction
Results
Less than $3,800,000 est. value
Ocala, FL 34471

Specifications To Remove And Replace Diesel Generator
Renovation
Post-Bid
Marathon, FL

Construction BP6 Electrical Substation
Results
Tallahassee, FL 32301

Wauchla Substation Construction
Post-Bid
Wauchula, FL 33873

JEA Northside Generating Station (NGS) Breakroom Upgrade
Results
Jacksonville, FL 32226

Last Updated 08/12/2020 03:40 PM
Project Title

Electric and Gas Professional Engineering and Design Build Services

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34950   (Saint Lucie County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Professional Engineering and Design-Build Firms to perform services relating to the design, construction and/or analytical studies of electrical, gas and other miscellaneous projects on a continuing basis. The selection procedure will be in accordance with the requirements of Chapter 287.055, Florida Statutes, as amended. Firms interested in both professional engineering and design-build services must submit separate packages to be considered for both continuing contracts. Professional Engineering and Design-Build Firms shall be retained by the Fort Pierce Utilities Authority (FPUA) to perform professional engineering and design-build services on an as-needed basis relating to design and construction management of the Electrical and Gas Systems. Selection for continuing professional engineering and design-build services does not guarantee assignment to any project. FPUA retains the right to negotiate with any firm on any project, whether or not the firm is one with which FPUA has a continuing contract. FPUA anticipates awarding a minimum of six (6) professional engineering contracts and a minimum of three (3) design-build contracts. Design, construction and/or analytical studies for projects may be assigned in, but not limited to any of the following areas: •Transmission and Distribution •Systems Studies •Substations •Field Inspections and Commissioning •NERC Compliance •Gas Engineering Services •Contract Negotiations •Advanced Metering Infrastructure •GIS and Surveying •Other Miscellaneous Engineering Services

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents