Similar Projects
Auditorium Renovations Phase 2 at East Brunswick Campus
Renovation
Results
East Brunswick, NJ 08816

Toilet Room Alterations at East Brunswick Campus
Renovation
Results
East Brunswick, NJ 08816

Passaic County Technical Institute C-Wing Second Floor IT Department Addition
Addition
Results
Wayne, NJ 07470

Building Addition and Interior Renovations at Newark Technolgy Campus
Renovation, Addition - 136,200 SF
Construction
$28,500,000 est. value
Newark, NJ 07103

Construction Management Services for the Hunterdon County Vocational School District (HCVSD) North Campus
Renovation
Post-Bid
Flemington, NJ

Passaic County Technical Institute - HX Wing Automotive Storage Addition
Addition
Results
Wayne, NJ 07470

Islamic Academy Of Burlington County Gymnasium Expansion
Addition - 19,796 SF
Design
Burlington, NJ 08016

Paterson Charter School for Science and Technology Building Alterations - 34th Street Campus
Renovation
Results
Paterson, NJ 07514

New Addition at the Cumberland County Technical Education Center
Addition - 55,000 SF
Construction
$12,000,000 to $14,000,000 est. value
Vineland, NJ 08360

Passaic County Technical Institute C-Wing Kitchen Renovations
Renovation
Results
Wayne, NJ 07470

Lab Alterations at the Morris County School of Technology
Renovation
Results
$500,000 est. value
Denville, NJ 07834

Classroom and Shop Alterations at Piscataway Campus
Alteration
Post-Bid
Piscataway, NJ 08854

New Maintenance Building
New Construction
Results
Mays Landing, NJ

Construction Management Services for Essex County Schools of Technology Newark Tech Campus
Renovation, Addition - 136,200 SF
Results
Newark, NJ 07103

Reported 03/29/2022 07:30 AM
Project Title

Cumberland County Technical Education Center CTE Stem Expansion

Physical Address View project details and contacts
City, State (County) Vineland, NJ 08360   (Cumberland County)
Category(s) Education
Sub-Category(s) Vocational School
Contracting Method
Project Status Permitting, Construction Start Expected June 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $2,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

a. Area 1 consists of 3,882 square foot conversion of (3) three existing Allied Health classrooms into Tech classrooms and labs. Demolition is limited to removal of selective existing casework and built-in furniture. Work in this area includes construction of a new storage room, new casework, and work counters. Additional work involves installation of underslab electrical and data ducts throughout each of the three classrooms as well as electric /data surface raceways. All data wiring is to be included in the scope of work. Flooring is limited to installation of vinyl tiles at areas disturbed by under slab work. Ceiling work is limited to minor repairs at removed items and ceiling at new storage room. This work is to be completed by August 19, 2022. b. Area 2 consists of demolition of the interior of 5,292 square feet of existing board office area. Demolition includes all interior partitions, ceilings, floors. Extensive removal of mechanical and electrical devices is included in the demolition work. Plumbing demolition includes removal of (3) three single fixture toilet rooms. New work involves the construction of a Makerspace Suite including (1) one classroom, (1) one lab and (1) one shop as well as support spaces. Additional work involves installation of underslab electrical and data ducts throughout the classroom and lab as well as electric /data surface raceways. All data wiring is to be included in the scope of work. Electrical work includes multiple electric panels and two transformers. New plumbing is limited to hand sinks and emergency showers. Contractor is to provide a temporary barrier between the work area and gym lobby prior to start of school and it shall be removed when all work is complete. This work is to be completed by December 19, 2022.

Details

,, 9,174 SF - Vocational School, 3,882 SF Renovation, Vocational School, 5,292 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents