Similar Projects
Marshallville Preserve - State of Ohio
Renovation
Conception
$300,000 est. value
Marshallville, OH

Sgt Cleans Car Wash / Wooster
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Wooster, OH 44691

Roadway Minor Rehab - US 250
Infrastructure
Design
$1,674,950 CJ est. value
Wooster, OH 44691

Roadway Minor Rehab - SR 585
Infrastructure
Design
$1,935,460 CJ est. value
Wooster, OH 44691

Bridge Replacement (1 Bridge) - US 250
Demolition, New Construction, Infrastructure
Bidding
$1,276,646 CJ est. value
Wooster, OH 44691

Oak Hill Road Curb Ramp Replacement
Infrastructure
Bidding
$125,000 CJ est. value
Wooster, OH 44691

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

RFP D/B - Honeytown Road Bridge Design-Build Project
New Construction, Infrastructure
Post-Bid
$711,353 CJ est. value
Wooster, OH 44691

Running Track Resurfacing and Rejuvenation
Renovation
Results
West Salem, OH

WAY-VAR Wooster Streets FY23 Resurfacing Project
Infrastructure
Results
$950,841 CJ est. value
Wooster, OH 44691

Back Street Resurfacing
Infrastructure
Construction
$90,000 CJ est. value
West Salem, OH 44287

Melrose Drive Residential Development
New Construction, Infrastructure
Pending Verification
$31,500,000 CJ est. value
Wooster, OH 44691

Schaeffler Group Addition / Wooster
Addition, Infrastructure - 89,595 SF
Pending Verification
$11,000,000 CJ est. value
Wooster, OH 44691

Clinton Sewer System - Construction - Summit County
Infrastructure
Conception
$7,000,000 CJ est. value
Doylestown, OH 44230

Intersection Improvement (Safety) - SR 57
Infrastructure
Design
$2,363,443 CJ est. value
Marshallville, OH 44645

Last Updated 09/28/2023 12:02 PM
Project Title

Village of Marshallville - Marshallville Preserve REBID

Physical Address View project details and contacts
City, State (County) Marshallville, OH 44645   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $211,847 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: This project includes furnishing all labor, equipment, materials, and incidentals required to construct approximately 6,000 linear feet of crushed limestone surface nature trail, boardwalk, and a new rest area to be constructed at the existing parking lot for the Heartland Trail with restrooms and associated landscape and hardscape. All questions concerning the project should be directed to Kyle Lukes, PLA, ASLA at Environmental Design Group, 330-375-1390, klukes@envdesigngroup.com. Said bid guaranty shall be in the form of either a bond in the full amount of the BID or a certified check, cashier's check, or letter of credit in an amount equal to ten percent (10%) of the BID in accordance with Section 153.54 of the Ohio Revised Code. the Village reserves the right BD-1 to reject the bids of any bidder if the Village believes it would not be in the best interest of the Village to make the award of that bid; whether because the bid is not responsive, or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standards or criteria established by the Village. A bid guaranty filed in the form of a bond shall be in the form of the BOND included in these BIDDING DOCUMENTS. A bid guaranty filed in the form of a certified check, cashier's check, or letter of credit shall be conditioned to provide that if the bid is accepted, the BIDDER will, after the award of the contract, enter into a proper contract in accordance with the bid, plans, details, specifications, and bills of material. If the BIDDER enters into the contract, the BIDDER shall, at the time he/she enters into the contract, file a bond for the amount of the contract to indemnify the OWNER against all damage suffered by failure to perform the contract according to its provisions and in accordance with the plans, details, specifications, and bills of material. Each bidder is required to furnish with his proposal a Bid Guarantee and Contract Bond in accordance to Section 153.54 of the Ohio Revised Code. The bid bond may be in the form of a bid guarantee, letter of credit for 100% of the project, or certified check from a solvent bank or cash in the amount of 10% of the total bid submitted. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide such surety. Checks should be made payable to the Village of Marshallville. Bid guarantees/bid bonds will be returned to all unsuccessful bidders. The owner intends and requires that this project be completed no later than November 22, 2023

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents