Similar Projects
US 84 - Cam and Tom Overlay
Infrastructure
Bidding
$1,625,086 est. value
TX

2020 - E. Warren Street Improvements; 1st Street to FM 2063 Project
Infrastructure
Bidding
Hewitt, TX 76643

2021 31st and Gurley Street Improvements Project
Infrastructure
Post-Bid
Beverly Hills, TX 76711

McLennan County Line Road South Creek Crossing Improvements
Infrastructure
Post-Bid
TX

Southern Region Disaster Recovery Support BPA
Results

2020 Street Preservation Phase 3
Results
Less than $1,200,000 est. value
Waco, TX 76702

Parking Lot and Paving Improvements Spring Valley Elementary School
Infrastructure
Post-Bid
Hewitt, TX 76643

Street Improvements 2019 Reclamation Phase 1
Results
Less than $1,260,000 est. value
Waco, TX 76702

Dutton Avenue Improvements 11th Street to 26th Street
Results
$4,000,000 est. value
Waco, TX 76702

2020 - Ritchie Road Street Improvements Phase 2 Project
Results
Less than $950,000 est. value
Hewitt, TX 76643

Rattler Hill Road - Creek Crossing Improvements
Results
Waco, TX 76701

Washington Avenue Improvements 18th Street to University Parks Drive
Results
Less than $4,500,000 est. value
Waco, TX 76702

Webster Ave. Streetscape Improvements
Results
$1,300,000 to $2,800,000 est. value
Waco, TX 76700

2021 Street Preservation Phase 1, Micro-Surface and Slurry Seal
Results
Less than $128,841 est. value
Waco, TX

Upgrade MBGF
Results
$2,061,975 est. value
TX

Last Updated 02/15/2022 08:36 AM
Project Title

Street Rehabilitation - Phase 2

Physical Address View project details and contacts
City, State (County) Mart, TX 76664   (McLennan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Street rehabilitation, approximately four (4) miles in length. Method 1: Mill existing roads, grade subgrade and maintain positive drainage, stabilize to minimum 6” depth, roll and compact, and overlay with 2” ASPPM Grade 4 cold mix, Method 2: Mill in place and lay back approximately 6” depth, grade subgrade and maintain positive drainage, roll and compact, treat 4” with Iron Soil Stabilization Product, roll and compact.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents