Similar Projects
Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

Lake Gulch Whiskey Resort
New Construction, Infrastructure
Design
$50,000,000 est. value
Black Hawk, CO

Second Creek Farms
New Construction
Design
Commerce City, CO 80022

Loch Lon Playground Equipment Design, Procurement, and Installation Services
New Construction
Bidding
$170,000 est. value
Loveland, CO 80537

Peak View Park Development - Phase I
Renovation
Bidding
$370,000 est. value
Lakewood, CO 80227

On-Call Services for Crew-Based Park Stewardship/Improvement Projects
Post-Bid
Denver, CO

2020 Playground Equipment Replacements
Post-Bid
Less than $250,000 est. value
Arvada, CO

Design-Build Services for Widefield Community Park Phase II Improvements
Results
Colorado Springs, CO 80911

Falcon Regional Park Phase 2
Results
Falcon, CO 80106

Basalt River Park - Phase I & II
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Alta Verde Workforce Housing
New Construction - 68,976 SF
Construction
$23,425,362 est. value
Breckenridge, CO 80424

Fisher Farm Subdivision
New Construction
Pending Verification
Timnath, CO 80731

Reagan Ranch
New Construction
Pending Verification
Colorado Springs, CO 80929

Copper Rose Apartments
New Construction - 6,114 SF
Conception
$500,000 to $1,000,000 CJ est. value
Colorado Springs, CO 80902

Last Updated 07/08/2022 07:49 AM
Project Title

Community Center Tennis Court Restoration

Physical Address View project details and contacts
City, State (County) Glenwood Springs, CO 81601   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Site Preparation: The scope of work includes all site work required for the project, including complete removal of 3 existing tennis courts, all fencing within the 3-court footprint, 2 fixed cabanas; and topical preparation for the 4th court to be resurfaced only. Any poor soil shall be removed and replaced with suitable compactable fill material. Additional fill material shall be added to bring the pad up to the proper slope and elevation for water shed. 2. Subgrade: The subgrade should be prepared in accordance with local building techniques to provide a stable, well drained pad for the new tennis courts. The final prepared subgrade shall be free of any organic or non-compactable material. Fine grading shall be done with laser-controlled equipment. 3. Construction: Post tension concrete for 3 tennis courts- install 2” leveling base course, 1-layer 15-mill poly sheeting vapor retarder, and 5” inch thick post tensioned concrete slab. Finish with RSS color surface game lines. Install 10’ fencing around perimeter of the 3 courts with 4 entrance/exit points. Re-Install 2 cabanas. Resurface 4th tennis court. Colors for all products will be the choice of the City of Glenwood Springs. 4. Responsibility: The City will be responsible for any permits and necessary compliance costs. Community Center Court Dimensions: Courts 1-3 total dimension: 182’ X 122’ to the outer edge of the fence lines. (Complete renovation needed) Court 4 dimension: 120’ X 60’ to the outer edge of the fence line. (Recoat only)

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents