Similar Projects
Demolition of Surplus House
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Cloverport, KY 40111

Demolition Services Perry County
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Hazard, KY 41701

Residential Sound Insulation Program
Post-Bid
Louisville, KY

Asbestos Lead Maintenance Contract at Various Schools
Alteration
Post-Bid
Louisville, KY

Hazardous Gas Detection System
Infrastructure
Results
Lexington, Nicholasville, KY 40356

Hazardous Gas Detection System
Infrastructure
Results
Lexington, Nicholasville, KY 40356

Abatement of Rubberized Gym Flooring - Phase C
Alteration
Post-Bid
Frankfort, KY

Covington Central Riverfront (CCR) Demolition and Abatement
Demolition, Alteration
Results
Covington, KY 41011

Grease Trap And Septic Tank Services
Term Contract, Alteration
Post-Bid
Lexington, KY

Asbestos Abatement at Tates Creek High School - Phase 2
Alteration
Results
Lexington, KY 40517

Sale of Surplus Mulch
Term Contract
Post-Bid
Covington, KY

Granular Activated Carbon - Custom Reactivation or Virgin
Term Contract
Results
Fort Thomas, KY 41075

Marion C. Moore School Gym Floor Abatement
Renovation, Alteration - 7,000 SF
Post-Bid
Louisville, KY 40228

Asbestos Abatement at Boone County High School
Renovation, Alteration
Results
Florence, KY 41042

Refuse Collection
Alteration
Post-Bid
Crab Orchard, KY

Last Updated 02/02/2023 02:29 PM
Project Title

Demolition of Barns 8-12 Horse Park

Physical Address View project details and contacts
City, State (County) Lexington, KY 40511   (Fayette County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $240,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes removing the existing barns 8 through 12 in their entirety. Any existing concrete that is above grade is to be cut down 6 inches below grade. Existing slabs on grade to remain. New fill is to be installed at these areas and patched back with 3 inches of compacted DGA and 3 inches of base course asphalt where located within asphalt, and patched back with 2 inches of compacted DGA and 4 inches of concrete where located within existing concrete. Concrete or asphalt patch to be adjacent with existing grade. All MEP systems and components are to be demolished except for the plumbing service stub ups and electrical service stub ups. Both electric and plumbing services have been disconnected from the building. Existing conduits or piping below-grade shall remain in-place, and left protruding through the ground to the existing height of the closest fitting. Each barn has below-grade water service serving it, but barn 8 has two, 2" PVC water pipes that extend above ground at each end of barn and are to remain in place as referenced on the drawings.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents