Similar Projects
State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Post-Bid

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Paxton Creek Watershed Sediment Reduction
Term Contract
Results
PA

Road Widening, Paving, and Drainage Inlet Box Work on Harman Road
Infrastructure
Post-Bid
Halifax, PA 17032

Roadway and Drainage Improvements
Results
$900,000 to $1,000,000 est. value
Royalton, PA 17057

Stream Restoration for MS4 Credit in the Saw Mill Run and the Ohio Watershed
Infrastructure
Post-Bid
Harrisburg, PA

Lehigh Avenue Drainage Improvements and Dawn-Mar Street Drainage Improvements
Results
$193,000 est. value
Harrisburg, PA 17111

Hershey Road Culvert Replacement
Results
Halifax, PA 17032

2020 Drainage Improvements
Results
$1,900,000 to $2,000,000 est. value
Harrisburg, PA 17109

Cole Crest Accessibility and Retaining Wall Modifications
Results
$400,000 est. value
Bressler, PA 17113

Removal of a Stone Layered Culvert and Installing an Underdrain Pipe
Results
Halifax, PA

Cole Crest Accessibility and Retaining Wall Modifications
Results
$400,000 est. value
Steelton, PA 17113

Burd Run Restoration Project
Results
$200,000 to $230,000 est. value
Highspire, PA 17034

Sinkhole Repairs
Infrastructure
Results

Last Updated 12/07/2021 08:56 AM
Project Title

Bellevue Park Pond Retrofit Project

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17104   (Dauphin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this Project generally includes, but is not limited to, maintenance activities for two ponds approximately 0.2 acres in size to remove accumulated sediment by dewatering and mechanical dredging, regrading and planting of the pond banks to provide a stable slope; replacement of the lower pond spillway; installation of drainage structures, catch basins, storm sewer pipes, rock energy dissipators, a continuous monitoring and adaptive control system with pipe drainage valves, and E&S controls; topsoil placement and seeding for lawns and site restoration; plantings; and all other work identified in the Contract Documents. The Work is geographically located at the intersection of Pentwater Road and Bellevue Road within the City of Harrisburg. The Work includes all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents