Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Swedetown Road - RRR and Drainage Improvements
Infrastructure
Bidding
$2,000,000 est. value
Theodore, AL 36582

2018 Paygo - North Mcgregor Avenue Reconstruction
Infrastructure
Bidding
Mobile, AL 36608

2019 Miscellaneous Drainage Repairs (Group A)
Post-Bid
Mobile, AL

Delta Port Parking Lot and Shoreline Improvements
Post-Bid
Dauphin Island, AL

RESTORE - Phillips Restore Project - Mobile, Alabama
Results
$250,000 to $500,000 est. value
Mobile, AL

18/36 Runway Edge Dams
Results
Mobile, AL

BayPointe Hospital Retaining Wall
Alteration
Construction
Mobile, AL 36693

12 Mile Creek Headwater Restoration Project
Post-Bid
Mobile, AL

Berth 2 Fender Repairs From M/V Maxx B. Allision
Results
Mobile, AL 36602

2019 CIP Drainage Group F
Post-Bid
Mobile, AL

Head of Slip C Bulkhead Replacement
Results
Mobile, AL

Stickney Reservoir Improvements
Post-Bid
Mobile, AL

Steel Land Stabilization Grid
Results
AL

Gamma Dorms 0-4 Pipe Chases
Post-Bid
Mobile, AL

Reported 03/25/2022 12:00 AM
Project Title

Pier B South Sheet Pile Wall Replacement

Physical Address View project details and contacts
City, State (County) Mobile, AL   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the construction of a new sheet pile wall at Pier B South, inclusive of all demolition work, steel sheet pile installation, concrete work, utility work, miscellaneous rail, and fill work as indicated in the Contract Drawings and Specifications. The major components of the work include partial demolition and legal disposal of existing relieving platform concrete slab-on-grade, existing asphalt and railroad tracks, and existing timber wall. The disconnection of active existing utilities and reconnection after new wall is installed, the installation of new steel sheet pile wall and concrete cap the full length of the sheet pile wall, installation of flowable fill in voids underneath the relieving platform, backfill of excavation necessary for the installation of the new wall, and the reconstruction of the removed sections of relieving platform concrete slab, asphalt, and railroad tracks.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents