US Business 24 at MP 0.146
Bidding
Less than $1,000,000 est. value
CO

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Bridge Design, Construction, and Delivery
Post-Bid
Platteville, CO 80651

Bridge Expansion Joint
Post-Bid
Denver, CO 80204

Mesa-16-Q.5 Bridge Replacement
Results
Less than $1,672,643 est. value
Grand Junction, CO 81501

Design-Build Services for Willow Springs Ponds Pedestrian Bridge
Results
$75,000 to $200,000 est. value
Colorado Springs, CO 80905

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Hess Ranch Metropolitan District No. 6 – Filing 1 Bridges Project
Post-Bid
Parker, CO

Removal of Asphaltmat (Planing), Placement of Thin Bonded Polyester Concrete Overlay,Replacement of Bridge Joints and Bearings
Results
$5,000,000 to $20,000,000 est. value
Glenwood Springs, CO

Construction Management Services
Post-Bid
Englewood, CO 80110

Construction Manager (“CM”) Services
Results
CO

Wagon Creek Beekman Road Crossing
Post-Bid
San Luis, CO

High Line Canal Underpass at Hampden and Colorado
Results
$5,300,000 to $5,800,000 est. value
Denver, CO 80202

Bridge Repair Project West 44th Ave over Clear Creek
Post-Bid
$300,000 to $350,000 est. value
Wheat Ridge, CO

I-76 over Clear Creek Bridge Rehabilitation Project on MP 2.901 on I-76
Results
$1,000,000 to $5,000,000 est. value
CO

Last Updated 02/19/2021 11:50 PM
Project Title

Rehabilitation of 96th Avenue Bridge Over Bijou Creek – Phase 2

Physical Address View project details and contacts
City, State (County) Brighton, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Phase 2 construction project is intended to continue the rehabilitation of the existing 360-foot long by 24-foot wide, six-span, prestressed concrete tee girder bridge carrying East 96th Avenue over Bijou Creek in eastern Adams County. (The Phase 1 project involving substructure repairs was completed in 2020.) The Phase 2 work includes, but is not limited to, removal of the existing asphalt overlay from the bridge deck, concrete patching repairs to the bridge deck and curbs, replacement of expansion joint bridging plates, construction of deck drains, placement of a deck waterproofing membrane, construction of a new asphalt deck overlay and approach pavements (aprons), gravel road transitions and shouldering, and installation of new bridge rails and guardrails. Also included are construction surveying, public information services, and construction traffic control. The road will be closed to traffic at the bridge with a signed detour in place for the duration of the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents