Similar Projects
Pool Ventilation Upgrade
Renovation
Sub-Bidding
$400,000 CJ est. value
Windsor, CT 06095

Sage Park Middle School HVAC Renovation Project Phase 2
Alteration
Post-Bid
Windsor, CT 06095

55 Farmington Avenue HVAC Upgrades
Alteration
Post-Bid
$446,975 to $494,025 est. value
Hartford, CT 06105

Kitchen Hood Cleaning
Alteration
Results
Farmington, CT 06030

Public Safety Facility HVAC Removal and Replacement
Alteration
Results
$560,000 est. value
Waterford, CT 06385

HVAC System Replacement
Alteration
Post-Bid
East Granby, CT 06026

330 Windsor Avenue Community Center Gym HVAC Upgrades
Alteration
Results
$200,000 est. value
Windsor, CT 06095

Terminal HVAC Improvement Project - Bradley International Airport
Renovation
Post-Bid
$3,290,000 CJ est. value
Windsor Locks, CT 06096

Music Room Air Handling Unit Replacement at Sedgwick Middle School
Alteration
Results
$400,000 est. value
West Hartford, CT 06107

Windsor Avenue Community Center Gym HVAC
Alteration
Post-Bid
Windsor, CT 06095

HVAC Renovation Project for the LP Wilson Community Center Phase One
Renovation
Results
$3,865,000 CJ est. value
Windsor, CT 06095

Purchase of Unit Ventilators
Alteration
Post-Bid
Newington, CT

Boiler Replacement- CREC Windsor Head Start Interior
Renovation
Results
$975,750 CJ est. value
Windsor, CT 06095

Dehumidifier Unit Replacement at Cornerstone Aquatic Center
Alteration
Post-Bid
$200,000 est. value
West Hartford, CT 06107

Farmington High School and FPS Central Office Projects - Bid Package 2.23b Rebid
Renovation
Results
$1,259,500 CJ est. value
Farmington, CT 06032

Last Updated 07/07/2023 06:06 AM
Project Title

Cafeteria Air Conditioning At the Noah Wallace Elementary School

Physical Address View project details and contacts
City, State (County) Farmington, CT 06032   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $92,000 [brand] Estimate
Plans Available from Engineer - 06/08/23
Owner View project details and contacts
Architect View project details and contacts
Description

Farmington Public Schools reserves the right to reject any or all bids and to waive any or all informalities or technical defects, if it is deemed to be in the best interest of Farmington Public Schools to do so. Question Deadline 06/22/2023 Disconnection and off-site disposal of the existing equipment and reclaiming of refrigerant is the responsibility of the contractor and all costs associated with such must be included in the bid price If a crane will be required to hoist off any equipment or to hoist on the new units, all costs and permits for crane work will be the responsibility of the contractor and the cost shall be included in the bid price. Each bid shall be accompanied by a Bid Guarantee in the form of cash, bid bond, certified check, treasurer's check or cashier's check made payable to Farmington Public Schools in an amount not less than 10% of the bid. The successful bidder upon award of bid will need to provide a 100% Performance Bond and a 100% Labor and Materials Bond. For all questions please contact: Sam Kilpatrick at kilpatricks@fpsct.org or 860-673-2514 x 7050 Disconnection and off-site disposal of the existing equipment and reclaiming of refrigerant is the responsibility of the contractor and all costs associated with such must be included in the bid price If a crane will be required to hoist off any equipment or to hoist on the new units, all costs and permits for crane work will be the responsibility of the contractor and the cost shall be included in the bid price. Coordination of schedule and placement of crane must be provided to the Facilities Director and approved by the him prior to mobilization. Any damages to the roof caused by careless work will be the responsibility of the contractor and will be repaired at the contractor's expense. The contractor is responsible for all electrical work needed for the replacement of the HVAC units. The contractorisresponsible forreconnecting the new unitsto the buildings energy management system, including any new modules/hardware required for 100% complete system. The contractor is responsible for commissioning the new equipment once it is installed to ensure proper functionality and code compliance. o Provide as-built drawings, manufacturer's O&M manuals and equipment schedules at the conclusion of the project. o Provide and program new Air Conditioning and integrate new Air Conditioning with the existing building automation controls system. o If any existing hazardous materials are required to be removed to complete the project they must be identified by the contractor. Proper and safe removal of the materials will be required and will be provided to the City of Farmington as a change order. The City of Farmington reserves the right to competitively bid the hazardous waste removal identified by the contractor. Contractor will provide a schedule to including construction milestones, task durations, and lead times for equipment. The schedule will be detailed by using number of days after contract award for each construction milestones, task durations, and lead times for equipment. o Alternate comparable equipment must be submitted for review and approval.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents