Similar Projects
Section 5 - Cell 1 Reclaimed Area Liner Construction - Broome County
Infrastructure
Conception
$13,000,000 CJ est. value
Binghamton, NY 13901

Reconstruct Runway Safety Area Runway 34 EMAS Phase II - Broome County
Infrastructure
Conception
$3,000,000 CJ est. value
Johnson City, NY 13790

I-88 Invert Paving, Towns of Colesville and Bainbridge, Broome and Chenango Counties
Infrastructure
Design
$2,600,000 CJ est. value
Colesville, NY 13787

The Retreat at Bunn Hill
New Construction, Infrastructure
Design
$62,000,000 CJ est. value
Vestal, NY 13850

Hinman and CIW Court Resurfacing
Infrastructure
Bidding
$100,000 CJ est. value
Binghamton, NY 13902

Donna Dr Asbestos Abatement
Term Contract, Infrastructure
Bidding
$50,000 CJ est. value
Vestal, NY 13850

Town Hall Storm Water Control
Infrastructure
Post-Bid
$700,000 CJ est. value
Town of Union, NY 13760

Contract No. 1 - Pedestrian Safety Improvement Project
Infrastructure
Post-Bid
$24,500 CJ est. value
Binghamton, NY 13905

Bearcat Sports Complex Site Work for Turf Installation
Infrastructure
Results
Binghamton, NY 13902

300 Block N. Adams Avenue Street Reconstruction Jenkins to Pine Street
Infrastructure
Results
$133,574 CJ est. value
Endicott, NY 13760

Court Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Binghamton, NY 13901

Glidepath Battery Storage Facility
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Endwell, NY 13760

Broome County Community College - Roadway / Parking Lot Modification - Broome County
Infrastructure
Conception
$600,000 CJ est. value
Binghamton, NY 13905

Paving Services for Greater Binghamton Health Center
Infrastructure
Design
$600,000 CJ est. value
Binghamton, NY 13904

Broome County Land Bank Corporation Renovations and Reconstruction
Demolition, New Construction, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Johnson City, NY 13790

Last Updated 05/11/2023 02:26 PM
Project Title

Replace High Temperature Hot Water (HTHW) Lines - SUNY Binghamton

Physical Address View project details and contacts
City, State (County) Binghamton, NY 13902   (Broome County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,986,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 17, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The work of this single bid project includes replacing two sections of the Campus-wide high temperature hot water distribution system. The scope of work will remove and replace a section of piping in an existing box tunnel and a section of direct buried piping. The work will also include hazardous material abatement. All bidders must present evidence of skill, experience and financial qualifications per Information to Bidders, Section 7 of the project specs. Subcontracting is permitted (Section 2.18 of SUCF Agreement). Principal subcontractors must be named within 48 hrs after bid opening per Information for Bidders Section 8. Bidders must submit within 48 hrs. either certification of its NYS VendRep questionnaire (preferred) or a signed and notarized paper CCA2 form (Version 9/13 only), Attachments A, B, and C, Appendix A form, work descriptions, and preliminary project schedule. In accordance with State Finance Law 139-j, all non-technical inquiries regarding this procurement must be directed to Robbilee Luedtke at SUCF.ConstructionBids@suny.edu or for MWBE related issues, Scott Clay at SUCF.OpportunityAdmin@suny.edu. EEO goals for this project: 6% minority workforce and 3% female workforce Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 17% Women Owned Sub-Contracting Goal: 13% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 462 calendar days after receipt of the Notice to Proceed

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents