Similar Projects
RWC/H-20 Hutchinson Boiler Replacement
Alteration
Bidding
Hutchinson, MN 55350

Water Heater Replacement at MCF Moose Lake
Alteration
Bidding
$300,000 est. value
Moose Lake, MN 55767

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Boiler Inspection and Services
Alteration
Bidding
Minneapolis, MN 55411

Chiller Maintenance
Post-Bid
Minneapolis, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Boiler Services
Term Contract
Post-Bid
Moorhead, MN

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Boiler and Chiller Replacement
Post-Bid
Woodbury, MN 55125

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Furnace Upgrades & Air Quality Improvements
Post-Bid
Crookston, MN 56716

Repair Buildings 1 and 2 at MVH - Electrical and Mechanical
Results
Less than $230,000 est. value
Hastings, MN 55033

Last Updated 08/30/2021 05:27 AM
Project Title

Water Heater Replacement at MCF Red Wing

Physical Address View project details and contacts
City, State (County) Red Wing, MN 55066   (Goodhue County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $240,978
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demolition of the two existing steam to domestic water heaters and selected piping. 2. Demolition of the two existing domestic hot water recirculation pumps and selected piping and wiring. 3. Installation of two new steam to domestic water heaters and selected piping. 4. Installation of two new domestic hot water recirculation pumps and selected piping and wiring. 5. Re-insulation of selected portions of the existing domestic and steam piping systems. 6. Extension of the existing campus BAS to provide monitoring/control of the newly installed equipment.

Details

Division 02 - Existing Conditions, Demolition.
Division 22 - Plumbing, Electric Domestic Water Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents