Similar Projects
HMBC Distribution Center Building IV
New Construction - 478,295 SF
Design
$40,000,000 est. value
Kansas City, MO 64157

Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

KCI Intermodal Business Center - Master Plan
New Construction
Pending Verification
Kansas City, MO 64155

KCI Intermodal Business Center LC7
New Construction - 216,320 SF
Pending Verification
$10,000,000 CJ est. value
Kansas City, MO 64153

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Weise House in Street Ferdinand Park Basement Work and Grading
Infrastructure
Results
Florissant, MO

KCI Intermodal Business Center - LC8
New Construction - 459,680 SF
Pending Verification
$10,000,000 CJ est. value
Kansas City, MO 64163

Excavating and General Maintenance Services
Term Contract, Infrastructure
Post-Bid
Sparta, MO

Gateway Arch National Park Site Improvements
Infrastructure
Results
Saint Louis, MO

Tnt Crust Addition
Addition - 2,450 SF
Pending Verification
Saint Charles, MO

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Engine House 2 and 3
New Construction
Results
Saint Louis, Wildwood, MO 63005

Last Updated 08/29/2022 04:02 PM
Project Title

Owens Corning - Contract 5

Physical Address View project details and contacts
City, State (County) Joplin, MO 64804   (Jasper County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents