Reported 11/18/2020 12:00 AM
Project Title

Pearland Parkway Traffic Improvements, Pearland Parkway Traffic CircleModifications, Intersection Improvements – Windward Bay/Broadway

Physical Address View project details and contacts
City, State (County) Pearland, TX   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,790,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pearland Parkway Roundabout Improvements (COP PN:TR1903): The project will entail the construction of a roundabout in the Pearland Parkway and McHard Rd. intersection. It will include an additional lane along Pearland Parkway as well as a driveway into the University of Houston Clear Lake Campus. Besides the proposed roadway construction, the project will entail the extenstion of an existing storm sewer system, relocation of illumination structures, relocation of an electric meter, demolition of 2 monument signs and the extension of existing sidewalks. Pearland Parkway Traffic Improvements (COP PN:TR1902): The project will entail the construction of intersection improvements for Pearland Parkway & Forest Park Lane/Summit Springs Lane, including construction of a traffic signal and the extension of left turn bays. The project also includes installation and testing of fiber optic cable via 4” ITS Multiduct along McHard Road & Pearland Parkway from Old Alvin Road to Barry Rose Road/Hughes Road. Intersection Improvements Windward Bay (TR1803): The project will entail the construction of intersection improvements for Windward Bay Drive and Broadway Street including construction of a fully actuated traffic signal, extension and widening of existing eastbound and westbound left turn lanes, traffic signage, and pavement markings. The project also includes installation and testing of fiber optic cable via 4” ITS Multiduct, communication ground boxes, and fiber markers along Broadway Street from Shadow Creek High School to Windward Bay Drive. Fiber interconnect will be provided to three traffic signals along Broadway Street (including Windward Bay Drive signal).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents