Similar Projects
B-4257-Provide Utilities for Communication Tower
Results
Cherry Point, NC 28533

Repair TACAN Tower at B1660
Results
$100,000 to $250,000 est. value
Cherry Point, NC

Signal Mounting Assembly - Yellow
Alteration
Post-Bid
Greensboro, NC

Tower and Civil Works Portion of the Radios and Communications Project
Post-Bid
Wilmington, NC

Engineer Stamped Tower Foundation Design
Infrastructure
Post-Bid
Clinton, NC 28328

Northeast Communications Tower Construction
New Construction
Results
$2,200,000 est. value
Gold Hill, NC 28071

Tower Replacement Hickory NC
Results
$135,000 to $185,000 est. value
Hickory, NC 28601

Install Antennas for Radio Network for City of Raleigh
Post-Bid
Raleigh, NC 27601

Antenna Installation Services
Post-Bid
Clyde, NC 28721

Automated Traffic Signal Performance Measures (ATSPM) System
Term Contract
Post-Bid
Charlotte, NC

911 and Emergency Services Facilities Public Safety Tower
Alteration
Post-Bid
Clinton, NC

Signal Mounting Assembly - Yellow
Alteration
Results
Greensboro, NC

Last Updated 01/24/2022 10:36 AM
Project Title

P228 ATC Tower & Air Operations

Physical Address View project details and contacts
City, State (County) NC   (Craven County)
Category(s) Tower/Signal System
Sub-Category(s) Tower/Signal System
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to construct a new 175' design eye height (205' overall height) air traffic control tower (ATCT). This building will include a reinforced concrete-on-pile foundation, cast in place or precast concrete exterior walls and a prefabricated metal deck cab roof. This building will have operational spaces for airfield air/ground traffic control, administrative space, training area, insulated glass tower control cab, electronic equipment spaces, electrical and mechanical utilities, fire protection systems, information systems, utilities and mechanical systems (HVAC), anti-terrorism/force protection measures, homer beacon, and uninterruptible power system (UPS). Audiovisual feeds will be installed for taxiway areas that are not monitored visually from the ATCT cab. Construct a new Air Traffic Control, Air Traffic Control Maintenance (ATC/ATCM) and Range Management Department (RMD) facility adjacent to the new ATCT. This building will be masonry veneered structure with a sloped and gabled standing seam metal roof on a concrete foundation. This building will be a two-story structure and will include administrative and maintenance work spaces for each department or division. This facility will have appropriate electronic equipment spaces. Construct a new Airfield Operations (AirOps) building located on the flightline. This building will be masonry veneer with a metal deck roof over open web steel joist framing on a concrete foundation. This building will house the administration of flight operational activities with supporting functions including, but not limited to, airfield management, flight support, flight planning, flight scheduling, communications, weather services, fleet liaison, and radar room.

Details

Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing.
Division 33 - Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents