Similar Projects
Montessori Children's House of Denver
New Construction - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Denver, CO

Promenade at Castle Rock
New Construction
Conception
Castle Rock, CO

Harvard Gulch West Trail (Elevate Denver Bond)
Design
Denver, CO

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Furnish and Installation of Basketball Backstops with Removal of Existing Equipment
Post-Bid
Denver, CO 80202

Metzler Ranch Park Dugout Construction
Post-Bid
Castle Rock, CO 80104

Eastonville Regional Trail
Results
Colorado Springs, CO 80900

CO FLAP SUM 91(1), Fremont Pass Trail
Results
$3,000,000 to $5,000,000 est. value
Frisco, CO 80443

Design/Build Services for Tennis Courts
Construction
Colorado Springs, CO 80920

Morgan Ralston Creek
New Construction
Pending Verification
Arvada, CO 80002

Reagan Ranch
New Construction
Pending Verification
Colorado Springs, CO 80929

Dry Lake Campground & Road Rehabilitation
Design
Steamboat Springs, CO

Meadows Community Center Playground Replacement
Post-Bid
Colorado Springs, CO 80905

CO FLAP DEN 56(1) Access Connections to ROAR
Results
$3,000,000 to $4,000,000 est. value
Commerce City, CO

Redtail Ranch Master Planned Community
New Construction
Pending Verification
Erie, CO 80516

Last Updated 12/08/2020 11:11 AM
Project Title

Secrest Park Phase I

Physical Address View project details and contacts
City, State (County) Arvada, CO 80005   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Including, but not limited to: 1. Minor tree removal 2. ADA accessible walkway traversing the site 3. Crusher fines surfacing 4. Coordination for an all-abilities playground integrated into the new plaza (purchased and installed by others) 5. Playpit and associated playpit ramp 6. Shade structure with LED downlight, other furnishings, and amenities in the plaza, as specified in the site drawings 7. A small outdoor classroom area (budget-dependent) 8. Pedestrian lighting 9. Additional landscaping (trees, shrubs, grasses, sod and seed) 10. Minor grading & area drain 11. Small culvert installation 12. Irrigation

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents