Similar Projects
Last Updated | 07/03/2023 02:34 PM |
Project Title | HVAC & Electrical Renovations at The Kenneth R. Olson Middle School and Tabernacle Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Tabernacle, NJ 08088 (Burlington County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,980,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract(s): Single Overall Contract (DPMC: C032 Prime with C009 & C047 Subcontractors) Project Description: The Base Bid at includes, but is not limited to the following: Kenneth R. Olson Middle School: Removal and replacement of HVAC equipment including, but not limited to, rooftop air conditioning units, air handling units, ductwork, piping, insulation, finned tube radiation, unit heaters, convectors, exhaust fans, make-up air units, condensing units, valance units, variable air volume boxes, unit ventilators, automatic temperature controls, air balancing, water balancing and air devices. New concrete pads, bollards and fencing. Tabernacle Elementary School: Removal and replacement of HVAC equipment including, but not limited to, rooftop air conditioning units, air handling units, finned tube radiation, unit heaters, convectors, exhaust fans, make-up air units, condensing units, variable air volume boxes, unit ventilators, automatic temperature controls, air balancing, water balancing and air devices. New concrete pads. Project Locations: 132 New Road, Tabernacle, New Jersey 08088 and 141 New Road, Tabernacle, NJ 08088 Alternate Bid(s): Alternate Bid No. 1: Unit Ventilator Removal in Room #'s B43, B44, B45, B46, B66 & B67 at Kenneth R. Olson Middle School Alternate Bid No. 2: Chiller #1 and #2 Replacement, including Pumps P-1 and P-2 at Kenneth R. Olson Middle School Estimated Project Cost: $4,000,000.00 FVHD Contact: All request for information must be submitted in writing by May 18, 2022 and emailed to cwoodward@fvhdpc.com or by faxing 609.883.2694. All correspondence must include the Architect Project Name and Number. Additional Information: Physical Start on or about July 5, 2023. Substantial Completion: August 23, 2024. Final Completion: September 24, 2024 All requests for information (RFI) must be submitted in writing by May 18, 2022, and sent to emailing cwoodward@fvhdpc.com, or by faxing to 609-883-2694 or via common carrier to the Architect. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |