Similar Projects
Old Cypress Preserve- Infrastructure
New Construction
Conception
Longs, SC

Riverland Oaks
New Construction
Design
James Island, SC

Footings Construction
Design
$1,000,000 to $5,000,000 est. value
Eastover, SC

Lowcountry Regional Airport Sitework Repairs
Bidding
Walterboro, SC 29488

Site Grading at 113 Leesburg Peak
Bidding
Greer, SC 29651

Public Storage
New Construction
Bidding by Invitation
Charleston, SC 29414

Fox Rae Farms - Infrastructure
New Construction
Post-Bid
Conway, SC 29526

Palmetto Trail - Ross Mountain Passage
New Construction
Post-Bid
Mountain Rest, SC 29664

TOC - Site Work Contracting Services
Results

TOC - Site Work Contracting Services
Results

Clemson Cottages
New Construction
Construction
Clemson, SC 29631

Olivia Springs
New Construction
Construction
Spartanburg, SC 29301

Parking Lot
Renovation, Addition
Design
Charleston, SC

Utilities To FMU Nature Center
Bidding
Florence, SC

Katy Hill Village - Infrastructure
New Construction
Post-Bid
Charleston, SC

Last Updated 05/13/2020 06:37 AM
Project Title

I-26 Phase II Clear Zone Improvements

Physical Address View project details and contacts
City, State (County) (Berkeley, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Traffic Control 1.000 Ls Law Enforcement Officer 1,000.000 Hr Clearing & Grubbing Within Roadway 1.000 Ls Unclassified Excavation 1,000.000 Cy Borrow Excavation 149,200.000 Cy Permanent Construction Signs (Ground Mounted) 896.000 Sf Cleaning Existing Pipe 500.000 Lf Adjust Catch Basin 5.000 Ea Adjust Drop Inlet Adjust d. i. 5.000 Ea Rip-Rap (Class a) 1,900.000 Ton Rip-Rap (Class b) 200.000 Ton Geotextile For Erosion Control Under Riprap(Class 2)Type c 14,700.000 Sy Mt3 Leading End Treatment Tl3 35.000 Ea Median Cable Barrier 71,000.000 Lf Mb Trailing End Treatment 16.000 Ea Mgs3 Gr Standard Shoulder 16,160.000 Lf Cable Barrier End Anchor 100.000 Ea Temporary Barrier Fence 1,500.000 Lf Permanent Cover 70.000 Acre Temporary Cover 35.000 Acre Fertilizer (Nitrogen) 7,000.000 Lb Fertilizer (Phosphoric Acid) 7,000.000 Lb Fertilizer (Potash) 7,000.000 Lb Agricultural Granular Lime 140,000.000 Lb Selective Watering 271,500.000 Gal Mowing 140.000 Acre Enhanced Stacked Ditch Checks 87,500.000 Lf Hydraulic Erosion Control Product (Hecp) - Type 2 70.000 Acre Silt Fence 204,000.000 Lf Replace/Repair Silt Fence 3,000.000 Lf Cleaning Silt Basins 72,100.000 Cy Removal Of Silt Retained By Silt Fence 7,500.000 Lf Aggregate No.5 Or 57 For Erosion Control 150.000 Ton Stabilized Construction Entrance 10,175.000 Sy On-The-Job Trainee (Roadway) 1,040.000 Hr

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents