Similar Projects
Light Poles and Fixtures
Term Contract
Sub-Bidding
Augusta, GA 30904

Provision of Electrical Equipment Installation, Inspection, and Repair Services on an Annual Contract
Term Contract
Sub-Bidding
Lawrenceville, GA 30046

UPS and Inverter Maintenance Services
Term Contract
Post-Bid
Kennesaw, GA 30144

Uninterruptible Power Supply (UPS) and Inverter Maintenance Services
Post-Bid
Kennesaw, GA

Replacement of an Existing Generator
Results
Hinesville, GA 31313

Lighting Replacement at Liberty County High School
Results
Hinesville, GA 31313

Disc Golf Course Baskets and Tee Signs
Term Contract
Sub-Bidding
Bainbridge, GA 39819

Renovation of Three Hundred Thirty One (331) Electrical Panels
Post-Bid
Americus, GA 31719

Automatic Transfer Switches for Portable Generator
Results
Brunswick, GA 31520

Atlanta Wiring and Lighting
Post-Bid
Atlanta, Chamblee, GA 30329

Cornish Creek Three-Phase Switchgear
Results
Covington, GA 30014

Electrical Repair Services Annual Contract
Term Contract
Post-Bid
GA

Airport Road Generator Installation
Results
Hinesville, GA

Supply and Complete Installation Standby Generator Sets at Two Sanitary Sewer Lift Stations
Alteration
Post-Bid
Jefferson, GA

Led Luminaires for Whitewater Middle School Gym
Term Contract
Results
Fayetteville, GA 30215

Last Updated 09/02/2022 06:04 PM
Project Title

Drinking Water Treatment Plant #2 Emergency Generator

Physical Address View project details and contacts
City, State (County) Montezuma, GA 31063   (Macon County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the materials and labor to supply and install 1 new 150KW/187.5KVA, 480/277V, 3 phase, 4 wire standby diesel generator along with generator control panel, generator enclosure, automatic transfer switches concrete generator pad, complete electrical appurtenances, generator start up services, and all additional appurtenances needed for complete generator installation. No bids maybe withdrawn after the closing time for receipt of bids for a period of sixty (60) days except as specifically detailed in the Instructions to Bidders.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents