Similar Projects
Mechanical Contractors and Related Trades
Bidding
FL

J--Return Fan, Replace
Post-Bid
Miami, FL 33125

HUD - AC Replacement in LAN Room on 6th Floor
Post-Bid
Miami, FL 33131

FDOT HVAC Install: Sneads WB Weigh Station
Results

Replace Package AC Unit
Results
Homestead, FL 33030

Chiller Plant Services
Term Contract
Post-Bid
Miami, FL 33199

Replacement of AHU-16
Results
Miami, FL 33136

Testing & Certifications of Fume Hoods
Post-Bid
Miami, FL 33125

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

ACC-West Duct Heater Replacement (SBE Set Aside)
Results
$100,000 est. value
Miami, FL 33136

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

HVAC and Mechanical Products
Term Contract
Post-Bid

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

Last Updated 03/04/2020 02:53 PM
Project Title

Heat Pump AHU Replacement (SBE Set Aside)

Physical Address View project details and contacts
City, State (County) Miami, FL 33136   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Existing heat pump AHU, connections and components as required to accomplish replacement, including, but not necessarily limited to: electrical connections, ductwork, refrigerant lines and condensate drain lines. Properly dispose of the existing equipment and provide turnkey installation to furnish and install new equipment detailed below. The contractor shall carefully perform selective demolition to safeguard the existing equipment which is scheduled to remain and be reconnected. All work shall conform to Florida Building code and the authority having jurisdiction requirements. The bidder’s lump sum should be inclusive of all costs and incidental items related to the full and complete scope, include any and all items that are necessary for a complete workmanlike installation. The work is located at Jackson Memorial Hospital Central Building, 1611 NW 12 Avenue, Miami, FL 33136. 1. Provide all required construction services to prepare location for installation of the new equipment. 2. Remove existing AHU and selectively demo existing connections and components as required to accomplish replacement. Owner to provide direction for disposition of the equipment. 3. Provide new air handling units (AHU) matching the specified manufacturer and capacity in the four (4) locations. 4. The scope calls for two (2) new 1” ball valves, two (2) new 6” threaded hoses, and new flow switches at each AHU.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents