Similar Projects
Green Bay Window Cleaning Services
Term Contract
Sub-Bidding
Green Bay, WI 54301

2023 DPW Overhead Door Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Wausau, WI 54401

2021 Exterior Facade
Alteration
Post-Bid
Hayward, WI 54843

Weatherization Program
Term Contract
Post-Bid
Beloit, Janesville, WI 53546

River Block Window Replacement
Alteration
Results
Wisconsin Rapids, WI 54495

Overhead Garage Doors
Alteration
Results
Milwaukee, WI

Greenhouse Glazing Replacement - King Hall (University of Wisconsin - Madison)
Renovation
Construction
$199,922 CJ est. value
Madison, WI 53706

Stain Glass Window Repairs-door County Historical Museum
Renovation
Sub-Bidding
$90,000 CJ est. value
Sturgeon Bay, WI 54235

Capitol Window Sill Replacement - State Capitol Building Department of Administration Madison, Wisconsin
Alteration
Post-Bid
$250,000 est. value
Madison, WI 53703

Replace Overhead Apparatus Door
Alteration
Results
Fond du Lac, WI

Windows and Patio Doors (Commodity Only)
Alteration
Post-Bid
Milwaukee, WI

Entrance B Project
Alteration
Results
Mellen, WI

Window Replacement Project
Alteration
Post-Bid
Oshkosh, WI 54902

Olin Accessible Automatic Doors
Term Contract
Results
Madison, WI

Exterior Screen Doors
Alteration
Post-Bid
Milwaukee, WI

Last Updated 03/17/2023 01:31 PM
Project Title

Siding & Window Replacement

Physical Address View project details and contacts
City, State (County) Stevens Point, WI 54481   (Portage County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,590,050 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 17, 2023, a general contractor has been awarded, but construction is not expected to commence until late summer 2023. Work in general shall consist of the following work items: Single base bid for Removing and replacing siding and windows all as shown on the drawings and specifications. All plan deposit checks shall be made out to the Stevens Point Housing Authority. Nonrefundable mailing fee shall be made payable to Architects Group Limited. Electronic copies of the Plans and Specifications are available at no cost by contacting Architects Group Ltd. Bid Form, Bid Bond, Form of NonCollusive Affidavit, and Representations, Certifications and Other Statements of Bidders forms shall be submitted with bid. Failure to do so may be cause for rejection of bid. Copies of the abovementioned forms are in the specification book. Contractors shall also provide with bid, letters regarding Minority Participation and Section 3 Participation as outlined in these documents. A bid bond of 5% is required to be submitted with the bids for bids over $25,000 and the bonding company listed in Circular 570. See instructions to bidders for bond requirements. Each Bidder shall comply completely with Instructions to Bidders, Supplementary Instructions to Bidders and General Conditions of the Contract for Construction. This shall include evidence of an Affirmative Action Program, including women and minorities. Follow Executive Order 11246. Contractors shall comply with minimum salaries listed in the wage rates included in the specification. The Stevens Point Housing Authority reserves the right to reject any or all Bids or to waive any informalities in the Bidding. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Stevens Point Housing Authority. The requirements of Section 3 of the Housing and Urban Development Act of 1968 apply to this project and to the greatest extent feasible, contractors shall fulfill their obligation to utilize lower income residents as trainees and/or employees. See Supplementary Instructions to Bidders and General Conditions of the Contract for Construction, Article 40, regarding their responsibilities.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents