Similar Projects
Telford Unit - Replace Hot Water and Steam Piping
Alteration
Post-Bid
New Boston, TX 75570

2022 Street Preservation Phase 3,Modified Thin Overlay Mix
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Waco, TX 76701

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Clemens Unit: Replace Structural Floor and Plumbing System - B Building Wings C and D
Results
$2,389,331 est. value
Brazoria, TX 77422

Heat Trace and Pipe Insulation Services
Term Contract
Results
Wylie, TX

Last Updated 09/13/2022 04:13 PM
Project Title

North 1 Reservoir Roof Rehabilitation and Cielo Vista 0.1 MG Ground Storage Tank Replacement and Elevated Tank Ladder and Safety Improvements

Physical Address View project details and contacts
City, State (County) El Paso, TX 79925   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,488,767 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**Engineer Estimate: $2,488,766.96 - $2,014,716.11 PROJECT DESCRIPTION A. The Project consists of removal and replacement of the existing 100,000-gallon ground storage blend tank and associated piping and appurtenances, the removal and replacement of the existing supporting steel platform and safety ladders, and a new hoist rescue system. The Project site, known as Cielo Vista, is located at 9428 Daughtery Ave., El Paso Texas 79925. The Project consists of installing a new 100,000-gallon welded steel ground storage tank, 250 LF of new 16-inch water approved pipe with valves and fittings, 260 LF of new 20-inch water approved pipe, fittings, butterfly valves with manholes with valves, 265 LF of 24-inch Drainpipe, and a cathodic protection system (interior and exterior). Demolition and removal of existing non-compliant access ladders, platforms, rails and other appurtenances, furnishing and installing compliant access ladders, fall arrest systems, steel platforms, guard rails and a LIMPET combined fall prevention and ladder climb assistant system to be used as a rescue alternative. The project description, as shown above, is only a general overview of this project. Contractor shall refer to the project plans and specifications for further information. B. The Contractor shall furnish all labor, materials, equipment, tools, and incidentals and completely construct the Work, so it is ready to use as shown on the Drawings and as described in the Specifications. Each Bid shall be submitted in accordance with the Instructions to Bidders and be accompanied by a Bid Security in the amount of five percent of the amount bid. The Successful Bidder states he or she must furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond, in accordance with the Instructions to Bidders and the General Conditions. Wages paid on this project shall be not less than the minimum prevailing wage rates listed in the Contract Documents, Section 00840, General Wage Requirements. The El Paso Water Utilities (EPWU) adheres to the Cone of Silence policy which prohibits any communication regarding the Bid between potential bidders (and subcontractors) and EPWU Board Members, Staff, and assigned Consulting Engineers. The provisions do not apply to oral communications with Purchasing Agent or Administrative Analyst, provided the communications is limited strictly to matters of process or procedure already contained in the solicitation document, oral communications at pre-bid conferences, or communications in writing (email preferred) submitted to the Administrative Analyst in response to inquiries regarding the Bid. In addition to any other penalties provided by law, violation of the Cone of Silence by any bidder shall render that bidder's Bid voidable. Any person having personal knowledge of a violation of these provisions shall report such violations to the EPWU General Counsel and/or the Purchasing Agent in writing. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents