Reported 09/10/2021 12:00 AM
Project Title

Northport WWTP - Drying Bed Cover and Storm Drainage Improvements

Physical Address View project details and contacts
City, State (County) Northport, AL   (Tuscaloosa County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work to be performed include miscellaneous improvements to the existing drying bed cover and collection and rerouting of all stormwater runoff impacted by the sludge drying operations. The drying bed cover improvements will include installing new gutters and downspouts along with 12-inch and 8-inch HPDE drain piping to collect the roof drainage and discharge offsite. A ridge vent will be included as an additive alternate. The storm drainage improvements will include installing approximately 1,100 linear feet of 12- inch HDPE drain piping and various inlets to convey flows from this area to the existing WWTP drain pumping station to discharge at the headworks of the wastewater treatment plant.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents