Reported | 04/05/2022 12:00 AM |
Project Title | NEC-DA Fiber Optic Cabling Installation |
Physical Address | View project details and contacts |
City, State (County) | Warren, MI 48091 (Macomb County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected April 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All work described in this document shall be performed using the technical references listed below or as instructed by the COR. Unified Facilities Criteria (UFC) for Telecommunications Interior Infrastructure Planning and Design (UFC 3-580-01) NEC - National Electric Code TIA/EIA 526-7 - Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant - OFSTP-7 TIA/EIA 526-14 - Optical Power Measurement of Installed Multimode Fiber Cable Plant -- OFSTP-14 TIA/EIA 568-1 - Commercial Building Telecommunications Cabling Standard Part 1: General Requirements TIA/EIA 568-2 - Commercial Building Telecommunications Cabling Standard Part 2: Balanced Twisted-Pair Cabling Components TIA/EIA 568-3 - Optical Fiber Cabling Components Standard TIA/EIA 569 - Commercial Building Standards for Communications Pathways and Spaces TIA/EIA 598 - Optical Fiber Cable Color Coding EIA/TIA 606 - Administration Standard of Telecommunications Infrastructure EIA/TIA 607 - Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications TIA-758 - Customer-owned Outside Plant Telecommunications Infrastructure Standard (August 2004) CUITN Gigabit Ethernet Data Design Guide (US Army CECOM) AMSEL-IE-DE-04-055 - Worldwide Outside Plant Design and Performance Requirements - OSPDPR (US Army ISEC) AMSEL-IE-01003 - Army SIPRNet Security Design Guide, For Official Use Only (FOUO) NSTISSI TEMPEST/2-95 - Red/Black Installation Guide (FOUO) NSTISSI No. 7003 - Protected Distribution Systems OSHA Construction Industry and General Industry Standards 1926.21(b) (6) and 1910.146 for Confined Space Entry C.4.2 Specific Requirements: The contractor's proposal shall include cost for labor and materials for the work requested below. All new cable will be Single-Mode, Plenum Rated (Internal Building), with SC type patch panels (if required) and connectors. Telecommunications system labeling shall be completed in accordance with ANSI/TIA/EIA-606-A and shall conform to the Network Enterprise Center (NEC) standard. All cabling shall be labeled on both ends, within 12 inches of the end of the cable jacket, which shall be visible on the exposed part of the cable jacket. Install 24 Strand SM Plenum Rated Fiber Optic Cabling from Building 270 1st Floor (TR -100) Room 1402-U to Building 229 1st Floor (TR-14) Room 1B090-U o Building 270 end of Fiber Optic Cable shall be terminated with SC Style Connector pigtails and installed within existing Fiber Patch Panel o Building 229 end of Fiber Optic Cable shall be terminated with SC Style Connector pigtails and installed within New Wall Mounted Fiber Patch Panel Install 6 Strand SM Armored Fiber Optic Cabling from Building 229 1st Floor (TR-14) Room 1B090-U to Building 229 3rd Floor Room 300W (Secure Room) o Note: This cable run will pass through Building 229 3rd Floor Telecom Room (TR-16) and terminate in Room 300W (Secure Room). o Building 229 1st Floor end of Fiber Optic Cable shall be terminated with SC Style Connector pigtails and installed within New Wall Mounted Fiber Patch Panel o Building 229 3rd Floor end of the Fiber Optic Cabling shall terminated with SC Style Connector pigtails and installed within New Wall Mounted Fiber Patch Panel. Inter-building Breezeway o New conduit sleeves shall be installed in the breezeway between Building 270 and Building 229, for inter-building pathway. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |