Similar Projects
Pre-Engineered Duplex Pump Station
New Construction, Infrastructure
Bidding
$175,000 to $185,000 est. value
Pageland, SC 29728

Pacolet Mills 2 Pump Station Rehabilitation Project
Renovation
Bidding
$220,000 est. value
Pacolet, SC 29372

Pump Station 7 Repairs
Post-Bid
$100,000 to $300,000 est. value
Hollywood, SC 29449

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

Pump Station #153 Control Panel Replacement
Results
Andrews, SC 29510

McRae Road Pump Station Upgrade
Results
Camden, SC 29020

Pump Station Upgrades Saxe Gotha Industrial Park
Renovation
Bidding
West Columbia, SC 29171

Plant Control Pump Station - Pump Base Improvements
New Construction
Post-Bid
Charleston, SC

1-20 Wastewater System Pump Station Repairs Project
Results
Lexington, SC 29072

Pump Station 2 Construction Services
New Construction
Bidding
Murrells Inlet, SC 29576

Buchanan Bridge Pump Station and Force Main
Renovation
Post-Bid
Less than $400,000 est. value
Chesterfield, SC

Pump Station 171 Bypass Pump Suction Piping Installation
Results
Myrtle Beach, SC 29575

O Dell Street Lift Station and Sewer Line
Infrastructure
Post-Bid
Liberty, SC 29657

Brunson Pump Station Modifications and Sewer Rehabilitation
Renovation
Results
Hampton, SC 29924

Sanitary Sewer Improvements Corley Tract Pump Station Modifications
Renovation
Post-Bid
$200,000 est. value
Lexington, SC

Reported 01/12/2022 12:00 AM
Project Title

Brunson Pump Station Modifications and Sewer Rehabilitation Division I Pump Station Modifications

Physical Address View project details and contacts
City, State (County) Brunson, SC   (Hampton County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Design-Build. Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes Replacement of submersible pumps, control panels, piping, and electrical components and generators at three (3) pump stations; rehabilitation of existing pump station wet wells (3); SCADA systems integration; site work; yard piping; erosion control; and all necessary appurtenances for a complete project.

Details

Lift and Pump Stations, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents