Similar Projects
East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Harris Teeter #345
Renovation - 58,652 SF
Construction
$3,509,985 est. value
Burlington, NC 27215

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Upgrading U.S. 70 to a Freeway
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Asphalt Resurfacing
Results
Hillsborough, NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Widens I-95 to Eight Lanes and Reconstructs Interchanges from South of I-95 Business / US 301 (Exit 56) to North of SR 1002 (Long Branch Road - Exit 71) in Cumberland and Harnett Counties.
Results

Construction Manager for UNC Charlotte East Village Infrastructure
Post-Bid
Less than $6,000,000 est. value
Charlotte, NC

Wrightsville Beach Paving Project
Results
Wrightsville Beach, NC

Last Updated 11/18/2020 06:09 AM
Project Title

Grading, Drainage, Paving and Structure

Physical Address View project details and contacts
City, State (County) NC   (Sampson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway Items Lump Sum Ls Mobilization Lump Sum Ls Type Ii Modified Approach Fill, Station ******* (15+46.50 -l-) Lump Sum Ls Grading 300 Cy Undercut Excavation 300 Cy Select Granular Material 300 Sy Geotextile For Soil Stabilization 50 Ton Incidental Stone Base 290 Sy Incidental Milling 140 Ton Asphalt Conc Base Course, Type b25.0c 290 Ton Asphalt Conc Surface Course, Type s9.5b 30 Ton Asphalt Binder For Plant Mix 44.8 Cy Subdrain Excavation 200 Sy Geotextile For Subsurface Drains 33.6 Cy Subdrain Coarse Aggregate 200 Lf 6" Perforated Subdrain Pipe 1 Ea Subdrain Pipe Outlet 6 Lf 6" Outlet Pipe 29 Lf Shoulder Berm Gutter 2 Ea Modified Concrete Flume 25 Lf Steel Beam Guardrail 25 Lf Steel Beam Guardrail, Shop Curved 4 Ea Extra Length Guardrail Post (**` Steel) (8`) 5 Ea Additional Guardrail Posts 1 Ea Guardrail End Units, Type At-1 4 Ea Guardrail Anchor Units, Type Iii 3 Ea Guardrail End Units, Type Tl-3 2 Ton Rip Rap, Class b 440 Sy Geotextile For Drainage 304 Sf Work Zone Signs (Stationary) 114 Sf Work Zone Signs (Barricade Mounted) 64 Lf Barricades (Type Iii) 4,200 Lf Paint Pavement Marking Lines (4") 7 Ea Permanent Raised Pavement Markers 1,075 Lf Temporary Silt Fence 75 Ton Stone For Erosion Control, Class a 5 Ton Stone For Erosion Control, Class b 80 Ton Sediment Control Stone 0.6 Acr Temporary Mulching 100 Lb Seed For Temporary Seeding 0.5 Ton Fertilizer For Temporary Seeding 200 Lf Temporary Slope Drains 520 Lf Safety Fence 10 Cy Silt Excavation 500 Sy Matting For Erosion Control 100 Sy Coir Fiber Mat 60 Lf 1/4" Hardware Cloth 3 Ea Special Stilling Basins 60 Lf Coir Fiber Wattle 0.6 Acr Seeding & Mulching 0.3 Acr Mowing 50 Lb Seed For Repair Seeding 0.25 Ton Fertilizer For Repair Seeding 50 Lb Seed For Supplemental Seeding 0.5 Ton Fertilizer Topdressing 275 Lf Impervious Dike 10 Mhr Specialized Hand Mowing 12 Ea Response For Erosion Control 2 Ea Concrete Washout Structure Structure Items Lump Sum Ls Removal Of Existing Structure At Station ************ (15+46.50 -l-) Lump Sum Ls Asbestos Assessment 1 Ea Pda Testing Lump Sum Ls Unclassified Structure Excavation At Station ******** (15+46.50 -l-) 39.1 Cy Class a Concrete (Bridge) Lump Sum Ls Bridge Approach Slabs, Station ************ (15+46.50 -l-) 6,366 Lb Reinforcing Steel (Bridge) 14 Ea Pile Driving Equipment Setup For *** Steel Piles (Hp 12 x 53) 8 Ea Pile Driving Equipment Setup For *** Galvanized Steel Piles (Hp 14 x 73) 630 Lf Hp12x53 Steel Piles 400 Lf Hp14x73 Galvanized Steel Piles 12 Ea Pile Redrives 210.5 Lf Vertical Concrete Barrier Rail 155 Ton Rip Rap Class Ii (2`-0" Thick) 175 Sy Geotextile For Drainage Lump Sum Ls Elastomeric Bearings 1,155 Lf 3`-0" x 1`-9" Prestressed Conc Cored Slabs 206.25 Lf Generic Structure Item Fiber Optic Conduit System

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents