Similar Projects
Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

New Wastewater Treatment Plant
New Construction
Conception
$12,000,000 est. value
Alton, TX

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

TBWWTP Expansion, Phase II
Addition
Design
$28,820,000 est. value
Temple, TX 76502

Wastewater Treatment Plant Headworks Improvements
Renovation
Bidding
$1,550,000 to $1,600,000 est. value
Colorado City, TX

Wastewater Treatment Plant 3 Phase 1 0.25 MGD
New Construction
Bidding
Farmersville, TX

WWTP Improvements TWDB
Post-Bid
Huntington, TX

Centrifuge Control Panel Replacement at Robinson Creek WWTP
Post-Bid
Huntsville, TX

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

Wastewater Treatment System
Results
TX

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

New Solid Waste and Recycling Facility
New Construction
Pending Verification
$6,530,000 est. value
Temple, TX

Dallas Salmon Wastewater Treatment Plant Operations Center
New Construction - 10,000 SF
Design
$5,003,625 est. value
League City, TX 77573

Secondary Digester Rehabilitation Phase 1 - Secondary Anaerobic Digester No.1 Cleaning
Alteration
Bidding
$100,000 est. value
Kilgore, TX

WWTP Phase I
Post-Bid
Conroe, TX

Reported 04/13/2022 11:39 AM
Project Title

2021 WWTP Expansion

Physical Address View project details and contacts
City, State (County) Canton, TX   (Van Zandt County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method
Project Status Construction Commenced April 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Demo Existing and Add 4 New 30 HP Influent Submersible Pumps 2. Construct Foundations and Add 2 New 50 HP Oxidation Ditch Fixed Rotors 3. Construct New Clarifier 4. Construct New Sludge Pump Station 5. Demo Existing and Add New Digester 20 HP Mechanical Aerators 6. Valve and Piping Additions 7. New Concrete Paving 8. Additional related items.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents