Similar Projects
Electrical Outlet Installation
Post-Bid
Warren, MI

Harvey and Plumbrook Electrical-R
Post-Bid
Sterling Heights, MI 48313

Police Station Emergency Generator Replacement
Results
Warren, MI 48093

Generator for Clinton Township Department of Public Services DPW Building
Results
$120,000 est. value
Clinton Township, MI 48036

Lake St Clair Design of Electrical Upgrades and Replacements
Post-Bid
MI 48045

One Time Purchase of 68W and 135W Traffic Signal Lamps
Results
Mount Clemens, MI 48043

Transfer Switch
Post-Bid
Mount Clemens, MI

DPW Electrical Service Replacement
Results
Richmond, MI 48062

Synchronized Clock System, PA System and Low Voltage Cabling
Post-Bid
Warren, MI

2021 - 2023 Generator Maintenance
Term Contract
Results
Less than $27,139 est. value
Richmond, MI

Generator Waste Water Plant
Post-Bid
New Baltimore, MI

Sound and Light Production for City Events
Results
Sterling Heights, MI

99--Digital-Electronic Display Sign Purchase & Install
Term Contract
Post-Bid
Harrison Township, MI 48045

On-Call Electrical Services
Term Contract
Results
Less than $90,000 est. value
Warren, MI

2021-2022 Christmas Lighting
Term Contract
Post-Bid
Romeo, MI

Reported 03/17/2022 02:24 PM
Project Title

Feeder 5 Emergency Electrical Infrastructure Repair

Physical Address View project details and contacts
City, State (County) Harrison Township, Mount Clemens, MI 48045   (Macomb County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

EMERGENCY ELECTRICAL INFRASTRUCTURE REPAIR FEEDER 5 AT SELFRIDGE ANGB – Project VGLZ 222005 The contractor shall coordinate with the base electric Shop, follow all safety lock out and tag out procedures for all electrical work including demolition and new work. The Contractor shall coordinate with Base personnel for replacement of the medium voltage (4800 volt) feeder cable from Building 854 Switchgear breaker to wood pole 219, installation of new riser on pole 219 with new lightning/surge arrestors and grounding, installation of new duct bank, new grounding system for new distribution system. The Contractor shall obtain digging permit for all underground work including but not limited to installation of new duct bank and excavation, back filling or soil boring for new conduits and installation of man holes, new ground rods. The contactor shall coordinate with Base personnel before any kind of underground work. Contractor shall take all precautions not to disturb any underground utilities including gas, electric, communications, telephone, cable, water and sewer. The Contractor shall ensure that all excavated/work areas are barricaded.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents