Similar Projects
Peach Orchard Road Industrial Building
New Construction, Infrastructure - 300,000 SF
Conception
$32,400,000 CJ est. value
Salisbury, NC 28147

Pump Station Improvements - City of Salisbury
Renovation, Infrastructure
Conception
$600,000 CJ est. value
Salisbury, NC 28144

Henderson Grove Church Road Industrial Building
New Construction, Infrastructure - 756,000 SF
Design
$45,000,000 CJ est. value
Salisbury, NC 28147

Landfill Phase 5 Expansion - Rowan County
Infrastructure
Design
$6,100,000 CJ est. value
Salisbury, NC 28147

Traffic Signal System Network Upgrades
Infrastructure
Post-Bid
$70,000 CJ est. value
Salisbury, NC 28144

East Spencer CDBG-I Sewer Rehabilitation and Replacement
Infrastructure
Post-Bid
$300,000 CJ est. value
East Spencer, NC 28144

Grading, Drainage, Paving, Signals, and Structure
Infrastructure
Results
$2,000,000 est. value
Salisbury, NC 28147

Fire Station #3 - Mahaley Avenue
New Construction, Infrastructure - 19,397 SF
Results
$8,020,000 CJ est. value
Salisbury, NC 28144

Salisbury Oaks Apartments
New Construction, Infrastructure
Pending Verification
$13,700,000 CJ est. value
Salisbury, NC 28144

Bear Poplar Solar Farm
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Mount Ulla, NC 28125

Rockwell Secondary Waterline - City of Salisbury
Infrastructure
Conception
$750,000 CJ est. value
Salisbury, NC 28144

RFQ D/B - East Spencer Municipal Complex Building
New Construction, Infrastructure
Post-Bid
$13,000,000 CJ est. value
Salisbury, NC 28144

East Spencer VUR Sewer Rehab. Shaver Street
Infrastructure
Results
$137,889 CJ est. value
East Spencer, NC 28144

Knox Middle School Renovation - City of Salisbury
Demolition, Renovation, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Salisbury, NC 28144

Granite Quarry Secondary Waterline - City of Salisbury
Infrastructure
Conception
$750,000 CJ est. value
Salisbury, NC 28144

Last Updated 06/14/2023 05:12 PM
Project Title

NC Transportation Museum - Car Repair Sheds Abatement & Selective Demolition Package

Physical Address View project details and contacts
City, State (County) Spencer, NC 28159   (Rowan County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Museum, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

NOTE: The bidder shall include with the bid proposal the form Identification of Minority Business Participation identifying the minority business participation it will use on the project and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143-128.2c Effective 1/1/2002.) All contractors are hereby notified that they must have a proper license as required under the state laws governing their respective trades. General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Limited. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days. The owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents