Similar Projects
Huron Street Pathway
Infrastructure
Bidding
Ypsilanti, MI 48197

Rapids View Development
New Construction, Infrastructure
Bidding
$490,000 est. value
Huron Township, MI

Sidewalk Gap at Ann Arbor-Saline Road
Post-Bid
Ann Arbor, MI

Teft Trail Project
Post-Bid
Spring Arbor, MI

Flint GM Fisher Guide Site (Chevy Commons Parcel A)
Results
Flint, MI

Woodland Center Correctional Facility Security System Upgrades - Phase II
Results
Whitmore Lake, MI 48189

A2 Montessori Child Care Center
Renovation
Pending Verification
Ann Arbor, MI 48104

2022 Lookout Park Parking Lot Repair Project
Infrastructure
Bidding
Saint Joseph, MI

OPPA Middle School Driveway Parking Lot
Post-Bid
Oak Park, MI

4.52 MI of Construction of Sidewalk, Multi-Use Trails and Pavement Markings at Several Locations
Results
Traverse City, MI 49684

High School Parking Lot Improvements
Alteration
Bidding
Swartz Creek, MI

Road and Parking Lot Improvements
Post-Bid
Merrill, MI 48637

Sidewalk and Streetscaping Improvements
Results
Flint, MI 48502

Community Center Parking Lot Expansion
Post-Bid
Whitmore Lake, MI 48189

Parking Lot Addition and Sealcoating
Results
Lincoln Park, MI 48146

Reported 12/10/2021 12:00 AM
Project Title

Thunder Valley Trail Extension Improvements

Physical Address View project details and contacts
City, State (County) Gwinn, MI 49841   (Marquette County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. 1.35 miles trail construction with 0.35 miles needing side hilling on steep slope. Trail to be constructed is marked with red paint. Side hilling will be reviewed onsite with project manager prior to construction. 2. 1.45 miles trail construction with 0.35 miles needing side hilling on steep slope. Trail to be constructed is marked with orange and yellow paint. Side hilling will be reviewed onsite with project manager prior to construction. 3. 0.6 miles trail construction. Trail to be constructed is marked with red paint.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents