Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Bagan Park - 92067 - City Of Tigard
Infrastructure
Conception
$935,000 CJ est. value
Tigard, OR 97223

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

HiLight FTTP Construction Shute Park Phase 3 - Public Improvement ITB
Infrastructure
Bidding
$308,000 CJ est. value
Hillsboro, OR 97123

Rock Creek Campus Barn Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Portland, OR 97229

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

QSJ RCLR Road Repair
Infrastructure
Post-Bid
$125,000 to $145,000 est. value
Hillsboro, OR 97124

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Bull Mountain Road Water Pipeline - City Of Tigard
Infrastructure
Conception
$8,609,000 CJ est. value
Tigard, OR 97224

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Pavement Maintenance, Installation, Repair and Concrete Grinding Services
Infrastructure
Post-Bid
Hillsboro, OR

Last Updated 11/15/2022 01:05 PM
Project Title

Fanno Creek Trail Connections - Oregon Department of Transportation

Physical Address View project details and contacts
City, State (County) Tigard, OR 97008   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,002,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project constructs or improve four segments of the Fanno Creek Trail. Segment 1-Woodard Park to Grant Avenue; Segment 2-Ash Avenue to Hall Boulevard; segment 3- Tigard Library to Milton Court; segment 4 - 85th Avenue (South of Durham Road) to the Ki-A-Kurts Bridge. All segments of the Fanno Creek Trail within Tigard will be complete except for the segment from Bonita Road to the Tualatin River. This supports the vision statement in the City of Tigard's Strategic Plan: Tigard an equitable community that is walkable, healthy, and accessible for everyone. This project is included in the city's FY 2022-2028 Capital Improvement Plan. As of November 15, 2022, Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents